REPLACEMENT OF IN - SERVICE WATER MAIN VALVES & FITTINGS ON MAIN ST
Closed · Connecticut · Last reported Feb 2026
Source: Connecticut Purchasing Group
Work under this contract includes the replacement of approximately thirty ( 30 ) existing in - service 16 - inch butterfly valves and fifty ( 50 ) gate valves , varying in size from 4 - inches to 12 - inches , with new resilient wedge gate valves located along the Town - owned section of Main Street ( trailblazed as R
- Status
- Closed
- Sector
- Water Supply and Storage, Bridge, Metal, Road
- Location
- Connecticut, United States of America
- Updated
- 3 Nov 2026
- Source
- Connecticut Purchasing Group
ConstructChat
Ask ConstructChat about REPLACEMENT OF IN - SERVICE WATER MAIN VALVES & FITTINGS ON MAIN ST
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Work under this contract includes the replacement of approximately thirty ( 30 ) existing in - service 16 - inch butterfly valves and fifty ( 50 ) gate valves , varying in size from 4 - inches to 12 - inches , with new resilient wedge gate valves located along the Town - owned section of Main Street ( trailblazed as Route 83 ) primarily in the Downtown section of the Town of Manchester between Hartford Road and US Route 6 / 44 ( Center Street ). Included with the primary work in the Downtown area , there are three additional spot locations with valve replacements within the CT Dept . of Transportation - owned Route 83 ( S Main St ) right of way used to isolate the water main carried by the S Main St bridge over I - 384 ( valves are located beyond bridge limits / outside I - 384 right of way ). The project ' s valves identified have either failed or are at the end of service life and need to be replaced as part of system maintenance . Work includes other appurtenant work such as installation of resilient wedge gate valves at new locations , replacement of existing water main segments with ductile iron pipe ranging in size from 4 - inches to 16 - inches as part of reconnecting the replacement valve installations , temporary and permanent pavement repair , and traffic control . The Work may include the installation of various size insertion valves and line - stops to facilitate gate valve installations . |
Location
Country | United States of America (USA) |
State | Connecticut |
Source
Source | Connecticut Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Bridge, Metal, Road |
Article published date | 2026-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
