Request For Proposals: Artificial Intelligence Infrastructure And Energy Generation On Doe Land At Savannah River Site
Sector: Data Center • Location: Aiken, South Carolina, United States of America
Source: SAM.gov
Pursuant to the Executive Orders and statutory authorities, DOE’s National Nuclear Security Administration’s (NNSA) Savannah River Site (SRS) is issuing this Request for Proposals (the “RFP”) to solicit proposals from entities interested in entering a long-term Lease covering a portion of identified real property located at SRS in South Carolina. The Lease Agreement with the Government is for the
- Status
- Closed
- Sector
- Data Center, Nuclear, Government, Residential, Commercial
- Location
- Aiken, South Carolina, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Request For Proposals: Artificial Intelligence Infrastructure And Energy Generation On Doe Land At Savannah River Site
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | solicitation |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Pursuant to the Executive Orders and statutory authorities, DOE’s National Nuclear Security Administration’s (NNSA) Savannah River Site (SRS) is issuing this Request for Proposals (the “RFP”) to solicit proposals from entities interested in entering a long-term Lease covering a portion of identified real property located at SRS in South Carolina. The Lease Agreement with the Government is for the purposes of designing, financing, permitting, developing, constructing, installing, owning, maintaining, operating, and decommissioning AI data center and energy generation infrastructure (the “Project”) including, but not limited to: data center facilities with specialized Information Technology (IT) equipment; associated cooling facilities; energy supply infrastructure; transmission and storage infrastructure; and other ancillary facilities and equipment reasonably required for the installation, maintenance, operation, decommissioning, and site restoration/remediation of AI data center and energy generation facilities including such conduits, lines, wiring, electrical systems, interconnection facilities, and other ancillary facilities and equipment reasonably required for the installation, maintenance, operation, decommissioning and site restoration of an energy generation facility given the available real property described herein. |
Original sector | Information |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Aiken |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Data Center, Nuclear, Government, Residential, Commercial |
Article published date | 2025-12-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Data Center tenders in United States of America
- Data Center Disaster Recovery Implementation
- Primary Data Center Hardware
- VIRTUAL DATA CENTER (Cologix, Inc.) Amendment 5VIRTUAL DATA CENTER (Cologix, Inc.) Amendment 5
- VIRTUAL DATA CENTER (Cologix, Inc.) Amendment 5VIRTUAL DATA CENTER (Cologix, Inc.) Amendment 5
- VIRTUAL DATA CENTER (Cologix, Inc.) Amendment 5VIRTUAL DATA CENTER (Cologix, Inc.) Amendment 5
- C220--Nrm A/E - 528A7-25-178 Evaluate Syracuse Va Garage For Remaining Life
- 6540--Intraoperative Digital Guidance System - Cataract Surgery Lebanon Va Medical Center
- Conference Room Audio / Visual Equipment Package
