RESIDENTAIL ROOFING SERVICES - ARPA
Sector: Rail • Location: Alabama, United States of America
Source: Alabama Purchasing Group
A . Remove all the existing roofing materials down to the bare decking . Replace / repair all rotten , broken , damaged , or substandard decking and framing ( including barge rafters ). Contact the housing specialist at Community Services ( CS ) for a mandatory inspection after framing or decking repairs ; boots , valleys
- Status
- Closed
- Sector
- Rail
- Location
- Alabama, United States of America
- Updated
- 3 Nov 2026
- Source
- Alabama Purchasing Group
ConstructChat
Ask ConstructChat about RESIDENTAIL ROOFING SERVICES - ARPA
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | A . Remove all the existing roofing materials down to the bare decking . Replace / repair all rotten , broken , damaged , or substandard decking and framing ( including barge rafters ). Contact the housing specialist at Community Services ( CS ) for a mandatory inspection after framing or decking repairs ; boots , valleys and vents installed , and before covering with felt . Do not cover the roof without prior CS approval . Please schedule these inspections during regular business hours and allow the rehab specialist at least 2 hours lead time . Do not skip this step . B . Install new boots and flashings at all roof penetrations ( vent pipes , chimneys , etc .). C . Install new valley material as specified per case . All deficient materials will be replaced . D . Install new drip rail on each house . E . Ventilation will be specified for each house and may be swapping out an existing component , such as turbines , for a new one with no modifications necessary . Some houses will change to ridge vent installation . F . Properly dispose of all debris immediately at the end of each day . Do not leave fasteners , safety hazards , or debris on the ground . Use a magnetic sweep daily around the perimeter of the house and rake away all debris daily and before final inspection . G . Underlayment will be 30 # felt , stick down membrane , etc . covering the entire roof surface . |
Location
Country | United States of America (USA) |
State | Alabama |
Source
Source | Alabama Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Rail |
Article published date | 2026-05-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Rail tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- PreQualification of Bidders for Chaboya Improvements
- TOWN OF MANCHESTER PARATRANSIT SERVICES
- Stormwater Management Improvements Ocean County Fire Training Facility Ocean Township
- Work Related Activity Providers Opioid Affected Individuals
- WORKPLACE HARASSMENT PREVENTION TRAINING
- Industry Review Phase Eastridge to BART Regional Connector
