Retention Pond Vegetation Removal
Combined synopsis/solicitation · Florida
Source: SAM.gov
This project is to Remove Vegetation from the Retention Pond at the USDA, ARS, Gainesville, FL location. Please review the attached documents for the required information. Please sent you r quotes directly to the email Point of Contact in this solicitaion. A site visit has been scheduled for Wednesday May 13, 2026, at 8:00 am EST. If you would like to attend, please send the name of the personnel
- Status
- Prospective
- Sector
- Raw Materials, Commercial, Waste Processing and Treatment, Residential, Water Supply and Storage, Road
- Location
- Gainesville, Florida, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Retention Pond Vegetation Removal
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | combined synopsis/solicitation |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | This project is to Remove Vegetation from the Retention Pond at the USDA, ARS, Gainesville, FL location. Please review the attached documents for the required information. Please sent you r quotes directly to the email Point of Contact in this solicitaion. A site visit has been scheduled for Wednesday May 13, 2026, at 8:00 am EST. If you would like to attend, please send the name of the personnel requesting to attend with the name of the compnay which they are representing to lynn.hults@usda.gov by 2:00 pm CST Tuesday May 12, 2026. Questions and Answers. Q1: Overhead and street views indicate a need to get the surrounding shoreline cleaned up in order to gain access to the retention pond. We have equipment for that, but the steepness of the bank would dictate the use of either a track loader or an excavator to facilitate the job. Would this bid require debris removal to a landfill? A1: A tracked excavator will be necessary to preform the work required. The requirements are as follows. Removal of all vegetation in retention pond Removal of specified trees and vegetation immediately around retention pond Wet debris may be piled for removal after drying All debris will either be hauled off site or mulched on site Q2: Would we be able to leave equipment and trailers at the job site? A2: Equipment can be left on site during the prefomance of contractual work. Q3: Is there any special permitting required? A3: No special permitting is required on site. DOT may regulate the transportation of wet debris. Q4: What is the approximate pond size (acreage and depth)? A4: 150’ in diameter and 8’ below surrounding grade at bottom. These are NOT actual dimensions but estimates. Q5: Are stumps required to be removed as part of tree clearing? A5: Yes, stumps are to be removed. Q6: Are there any environmental restrictions or permits required for this work? A6: No permits are required on site for this work to our knowledge. Q7: Is there a preferred debris disposal method (mulching on-site vs. hauling off-site)? A7: No preferred method. The area is to be left tidy with no piles of debris at job completion. Q8: Are there any site access limitations we should plan for? A8: No. Q9: What is the required completion timeframe for the project? A9: 4 weeks from start of work. Q10: Does the pond have water in it? Does it need to be pumped to do the job? A10: We are in an exceptional drought this year. No water is visible right now. As to whether it needs to be pumped to do the job that would be up to the contractor to determine. |
Original sector | Administrative and Support and Waste Management and Remediation Services |
Location
Country | United States of America (USA) |
State | Florida |
City | Gainesville |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Raw Materials, Commercial, Waste Processing and Treatment, Residential, Water Supply and Storage, Road |
Article published date | 2026-05-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Raw Materials tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Hay Cutting and Removal for Jordan Farm and Coleman Farm
- Antiscalant Chemical
- As-Needed Sewer Inspection (FY23) [BID TABULATION]
- Landscaping (C-27 License), San Francisco, San Mateo, Santa ...
- Van Ness Avenue Auxiliary Water Supply System Upgredes
- Sunol Valley Water Treatment Plant Ozonation
- Oceanside Water Pollution Control Plant Digester Gas Utiliza...
