logo

Retrofit Condenser Water System Piping , Joint Force Headquarters Readiness Center

Sector: Water Supply and Storage • Location: California, United States of America

Source: California Purchasing Group

Tender
Closed
  • The contractor shall possess a valid and active California State License Board license appropriate for this scope of work , including but not limited to : C - 20 ( Warm - Air Heating , Ventilating and Air - Conditioning ). - The contractor shall provide complete engineering calculations supporting the proposed modificati
Status
Closed
Sector
Water Supply and Storage
Location
California, United States of America
Updated
3 Nov 2026
Source
California Purchasing Group

ConstructChat

Ask ConstructChat about Retrofit Condenser Water System Piping , Joint Force Headquarters Readiness Center

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Retrofit Condenser Water System Piping , Joint Force Headquarters Readiness Center” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to California, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

- The contractor shall possess a valid and active California State License Board license appropriate for this scope of work , including but not limited to : C - 20 ( Warm - Air Heating , Ventilating and Air - Conditioning ). - The contractor shall provide complete engineering calculations supporting the proposed modification , including system performance impacts and overall operational effects . - The contractor shall submit a detailed cost proposal , including labor , materials , equipment , overhead , and profit for evaluation against the IGE . - Existing electrical capacity is assumed to be adequate , but Verification of panel capacity , breaker sizing , and available load shall be confirmed by the contractor prior to installation . - If deficiencies are identified ( e . g ., insufficient capacity , breaker upgrades required ), the contractor shall notify the PM immediately . - Any required upgrades beyond the defined scope shall be addressed via change order upon approval . - Performance Period : The contractor shall complete all work within thirty ( 30 ) calendar days from the date defined in the job kick off meeting . - The contractor shall review and confirm that the performance period is achievable considering material lead times , labor availability , and site constraints . Any anticipated delays shall be identified prior to contract award . - The contractor shall provide full controls integration support , including access to the BAS / DDC system , adjustment of control sequences and setpoints , and comprehensive testing and balancing to verify system performance . - The contractor shall obtain written and stamped approval from the original equipment manufacturer , TRANE , confirming that the custom - designed WWHP can operate properly under the proposed modification , including connection to the cooling towers instead of the heating hot water loop . - Retrofit the condenser water system piping per customer request and Trane confirmation .

Location

Country

United States of America (USA)

State

California

Source

Source

California Purchasing Group

URL

More Details

Record type

Tender

Sector

Water Supply and Storage

Article published date

2026-05-10

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender