Revised Housing Rehab - Rogers County
Bids closed Mar 2026 · Oklahoma · Last reported Mar 2026
Source: Oklahoma Purchasing Group
Trade Appliances 1 Area : KITCHEN Work Description / Comments Gen . Spec . Qty Unit Div . # 10 . F . 1 Ea Dishwasher / Remove / Re - install dishwasher / Work shall include water lines and drain lines . 2 Area : KITCHEN Div . # 10 . D . 1 Ea 3 . D Vent - A - Hood / 30 "/ Ext . Vented / Install new kitchen vent - a - hood ( ext . ve
- Status
- Closed
- Sector
- Water Supply and Storage, Steel
- Location
- Oklahoma, United States of America
- Updated
- 3 Nov 2026
- Source
- Oklahoma Purchasing Group
ConstructChat
Ask ConstructChat about Revised Housing Rehab - Rogers County
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Trade Appliances 1 Area : KITCHEN Work Description / Comments Gen . Spec . Qty Unit Div . # 10 . F . 1 Ea Dishwasher / Remove / Re - install dishwasher / Work shall include water lines and drain lines . 2 Area : KITCHEN Div . # 10 . D . 1 Ea 3 . D Vent - A - Hood / 30 "/ Ext . Vented / Install new kitchen vent - a - hood ( ext . vent )/ 30 " Carpentry 3 Area : KITCHEN Div . # 6 . 0 . 1 12 . 8 LF Base Kitchen Cabinets / Replace / Prefinished Oak . Replace Base Cabinets , Includes , door and drawer pulls . Base cabinets has a dishwasher , need to measure cabinets . 4 Area : KITCHEN Div . # 6 . 0 . 4 . 12 . 8 LF Countertop / New / Post Form Top . Install new countertop and backsplash . Carpentry 5 Area : BATHROOM # 1 Div .# 16 . B . 2 . 1 Ea Door Opening / Widen / Interior / Widen interior door to 32 " opening / Install new door / pre - hung . Work shall include new door , framing , lockset , floor transition , paint and trim . 6 Area : EXTERIOR Div .# 8 . A . Door / Exterior / 6 - Panel Steel / Pre - Hung / Replace . Replace exterior entrance door with new pre - hung - steel six panel door . Work shall include paint - both sides , lockset , deadbolt Install in closet under carport . 7 Area : EXTERIOR Div . # 8 . A . Door / Exterior / Half - Glass / Pre - Hung Fiberglass /. Replace exterior entrance door with new pre - hung two panel with 1 / 2 glass with Mini Blinds between the glass . Work shall include paint - both sides , lockset , deadbolt & peephole . 8 Area : BEDROOM # 2 1 Ea 2 Ea Div . # 8 . A 2 Ea Passage Door , Jamb & Trim / Pre - Hung / Flush - Faced / Replace passage door & lockset with new pre - hung luan / flush faced , stain grade jamb and trim . Work shall include Stain & Clear Coat to match .. Replace the entry door and 1 closet door . 9 Area : BEDROOM # 3 Div . # 8 . A 1 Ea Passage Door , Jamb & Trim / Pre - Hung / Flush - Faced / Replace passage door & lockset with new pre - hung luan / flush faced , stain grade jamb and trim . Work shall include Stain & Clear Coat to match .. Replace the entry door . |
Location
Country | United States of America (USA) |
State | Oklahoma |
Source
Source | Oklahoma Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Steel |
Article published date | 2026-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
