logo

RFCC EARTHING SYSTEM STUDY

Sector: Oil and Gas • Location: Qatar

Source: QatarEnergy

Tender
Open

The scope is to include the provision of earthing system study at RFCC Unit 41 areas and Root Cause Analysis (RCA) of the damaged earthing grid cables and testing of existing earthing system. Contractor shall carry out the following to derive to immediate and long-term mitigations measures focusing on the measures against corrosion and compromised earthing system: 1. Engage a Specialist Consul

Status
Closed
Sector
Oil and Gas
Location
Qatar
Updated
3 Nov 2026
Source
QatarEnergy

ConstructChat

Ask ConstructChat about RFCC EARTHING SYSTEM STUDY

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “RFCC EARTHING SYSTEM STUDY” is a tender record in Taiyo, linked to the Oil and Gas sector. It is issued for works, goods, or services related to Qatar.

Participants

Not available for this record.

Status

Original status

open

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The scope is to include the provision of earthing system study at RFCC Unit 41 areas and Root Cause Analysis (RCA) of the damaged earthing grid cables and testing of existing earthing system. Contractor shall carry out the following to derive to immediate and long-term mitigations measures focusing on the measures against corrosion and compromised earthing system: 1. Engage a Specialist Consultant to study the existing earthing system on-ground and in-ground within Refinery RFCC plant area (Unit 41), conduct testing , RCA study to analyze the results, conduct workshop of findings and mitigations and provide implementable recommendations 2. Conduct soil sampling, analyses and testing 3. Carry out Root Cause Analysis study to analyze the results, conduct workshop of findings and mitigations and provide implementable recommendations. 4. Provide the most suitable design solutions of the new system ie. Buried or above ground design. 5. Preparation of scope for construction of the new suitable solution/ system and removal/ abandonment of the existing facility. 6. Carry out soil resistivity profiling and resistivity mapping. 7. Carry out material selection study. 8. Submission of study deliverables.

Original sector

ASSET INTEGRITY (REFINING)

Location

Country

Qatar

Source

Source

QatarEnergy

URL

More Details

Record type

Tender

Sector

Oil and Gas

Article published date

2026-02-15

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender