Rfi: Integration Of Advanced Medium Mobile Power Sources (Ammps) Kits Amendment 1
Sector: Manufacturing (Industrial) • Location: Fort Belvoir, Virginia, United States of America
Source: SAM.gov
Amendment 1 The purpose of this amendment is to address questions submitted by industry regarding the original RFI posting. Accordingly, the following updates have been made and are provided as attachments to this notice: Revised RFI Document: Please review the updated RFI for requirements clarifications. Associated Part Drawings: Supplemental technical drawings have been provided to assist in the
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Power Generation (CCGT), Aerospace & Defense, Government, Commercial, Residential
- Location
- Fort Belvoir, Virginia, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Rfi: Integration Of Advanced Medium Mobile Power Sources (Ammps) Kits Amendment 1
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | sources sought |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Amendment 1 The purpose of this amendment is to address questions submitted by industry regarding the original RFI posting. Accordingly, the following updates have been made and are provided as attachments to this notice: Revised RFI Document: Please review the updated RFI for requirements clarifications. Associated Part Drawings: Supplemental technical drawings have been provided to assist in the development of responses. Extension of Response Deadline: To ensure industry has sufficient time to review the revised documentation and incorporate these updates into their submissions, the response deadline is hereby extended. Original Response Deadline: May 11, 2026, at 3:30 PM EST New Response Deadline: May 13, 2026, at 3:30 PM EST __________ The Department of the Army is conducting market research in accordance with Federal Acquisition Regulation (FAR) Part 10 to identify sources capable of integrating Advanced Medium Mobile Power Sources (AMMPS) Kits onto either the 1-ton Light Tactical Trailer Heavy Chassis (LTT-HC) or the 2.5-ton M200A1 trailer. The Government owns the competitive Technical Data Package (TDP) for this integration, which will be provided as Government Furnished Information (GFI) under subsequent competitive action. This RFI is for informational and planning purposes only and does not constitute a Request for Proposal (RFP) or a promise to issue an RFP in the future. The Government will not award a contract on the basis of this RFI, nor will it pay for any information submitted by respondents. |
Original sector | Not Identified |
Location
Country | United States of America (USA) |
State | Virginia |
City | Fort Belvoir |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Manufacturing (Industrial), Power Generation (CCGT), Aerospace & Defense, Government, Commercial, Residential |
Article published date | 2026-05-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Manufacturing (Industrial) tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Sole Source for a Hand Held Video Receiver System
- Security Hardware Services
- KilleenFort Hood Regional Airport KFHRA Terminal Apron Rehabilitation Phase II
- PreQualification of Bidders for Chaboya Improvements
- Alonzo Babe James Community Center Playground Artificial Turf
- Prefabricated Manufactured Structures as Living Quarters for County Fire Personnel
