RFI2 24kV Ring Main Units
Prior information notice · Netherlands · Last reported Oct 2026
Source: TED Europa
This request for information is intended for investigating:
- The availability of SF6-free Ring Main Units (RMUs) to be implemented in the Stedin distribution grid.
- The feasibility of Stedin requirements that are currently under construction.
The RMUs must have a rated voltage of 24kV, rated busbar current of 630A and able to resist 20kA/1 short-circuit current. All RMUs are composed from a com
- Status
- Prospective
- Sector
- Warehouse
- Location
- Netherlands
- Updated
- 3 Nov 2026
- Source
- TED Europa
ConstructChat
Ask ConstructChat about RFI2 24kV Ring Main Units
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | prior information notice |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | This request for information is intended for investigating: * The availability of SF6-free Ring Main Units (RMUs) to be implemented in the Stedin distribution grid. * The feasibility of Stedin requirements that are currently under construction. The RMUs must have a rated voltage of 24kV, rated busbar current of 630A and able to resist 20kA/1 short-circuit current. All RMUs are composed from a combination of Load Break Switch feeders and Circuit Breaker feeders. Fuse feeders are out of scope. The RMUs are intended to be used as: * Standard 3 panel configurations in ring topology with self-powered protection relay. - 630/1000kVA distribution stations. - ≤1750kVA client connections with metering. * Standard configurations with protection relay requiring auxiliary voltage. - 3-panel for client connections 1.75-10.00MVA with metering. - 6-panel configurations. * Freely-configurable single panel designs for brownfield/renovation purposes. The RMUs will be both applied in prefabricated substations with downwards pressure relief and traditional substations with upwards pressure relief. The RMUs are to be delivered at the Stedin warehouse. Installation and commissioning is intended to be Stedin scope. |
Original sector | Electrical machinery, apparatus, equipment and consumables; lighting, Electrical machinery, apparatus, equipment and consumables; lighting, Construction work, Electrical machinery, apparatus, equipment and consumables; lighting, Construction work, Electrical machinery, apparatus, equipment and consumables; lighting |
Location
Country | Netherlands |
Source
Source | TED Europa |
URL |
More Details
Record type | Tender |
Sector | Warehouse |
Article published date | 2026-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Warehouse tenders in Netherlands
- Ontwerp, Levering, Installatie en Onderhoud - Magazijninrichting (nieuwbouw) voor lange lengte en plaatstellingen
- Marktconsultatie. Realisatie van het casco inbouwpakket en installaties in Magazijn De Zon
- Galileo Reference Centre (GRC) Facilities Management and Logistics (FML) Services - EUSPA/NP/06/25
- Mobiele telefoons en aanverwante dienstverlening
- Mobile Jerrycan Filling Stations (MJFS)
- ICT-hardware en dienstverlening
- Supply and Analysis of NH₃ Passive Samplers (Diffusion Tubes) for the MAN Network and additional projects
- Marktconsultatie Logistiek Afvoer en Reparatie van Standaard IT Hardware