logo

RFP 2794 - Temuka Raw Water Trunk Network Upgrade – Design and Build

The scope, dates and status of this tender. A free account opens every field.

Source: New Zealand Government Electronic Tenders Service (GETS)

Tender
Closed

TDC is seeking a qualified and experienced Three Waters contractor who is ready to try their hand at something a bit different – not just construction, but design too.Raw water for treatment at the Temuka Water Treatment Plant is sourced from six bores - three located on the treatment plant site and three located approximately 400-500 metres away near the intersection of Orari Station and Coach Ro

Status
Closed
Sector
Water Supply and Storage, Road, Government, Waste Processing and Treatment
Location
New Zealand
Updated
3 Nov 2026
Source
New Zealand Government Electronic Tenders Service (GETS)

ConstructChat

Ask ConstructChat about RFP 2794 - Temuka Raw Water Trunk Network Upgrade – Design and Build

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “RFP 2794 - Temuka Raw Water Trunk Network Upgrade – Design and Build” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to New Zealand.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

TDC is seeking a qualified and experienced Three Waters contractor who is ready to try their hand at something a bit different – not just construction, but design too.Raw water for treatment at the Temuka Water Treatment Plant is sourced from six bores - three located on the treatment plant site and three located approximately 400-500 metres away near the intersection of Orari Station and Coach Roads. Of the off-site bores, only one is currently in service, and raw water is conveyed to the treatment plant via a single 150mm diameter pipeline. The two other off-site bores are new.Additional raw water conveyance capacity is required to enable supply from the two new off-site bores and to meet increasing demand. There is also a requirement to introduce redundancy into this part of the system. To achieve this, TDC requires the construction of a second raw water pipeline.We want to trial giving you the parameters, and you provide us with the full package – design through construction, testing and completion of the installed pipeline.

Location

Country

New Zealand

Source

Source

New Zealand Government Electronic Tenders Service (GETS)

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Road, Government, Waste Processing and Treatment

Article published date

2026-10-30

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender