RFPQ 26024 Middle Oconee East Trunk Sanitary Sewer Improvements Phase 1A
Bids closed Mar 2026 · Georgia · Last reported Feb 2026
The Unified Government of Athens-Clarke County desires to solicit Pre-Qualification Applications in accordance with the Georgia Local Government Public Works Construction Law (the ¿Georgia Public Works Law¿) from responsible Construction General Contractors. Responsible General Contractors are to provide all construction, materials, equipment, and labor to complete the Middle Oconee East Truck San
- Status
- Closed
- Sector
- Bridge, Road, Car parking, Cement, Metal, Power Transmission, Automotive, Water Supply and Storage, Power Generation (CCGT), Government, Waste Processing and Treatment
- Location
- Georgia, United States of America
- Updated
- 3 Nov 2026
- Source
- Georgia Procurement Registry
ConstructChat
Ask ConstructChat about RFPQ 26024 Middle Oconee East Trunk Sanitary Sewer Improvements Phase 1A
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Unified Government of Athens-Clarke County desires to solicit Pre-Qualification Applications in accordance with the Georgia Local Government Public Works Construction Law (the ¿Georgia Public Works Law¿) from responsible Construction General Contractors. Responsible General Contractors are to provide all construction, materials, equipment, and labor to complete the Middle Oconee East Truck Sanitary Sewer Improvements - Phase 1A: This work shall replace an aging 30-inch concrete pipe trunk line and manholes located along the Middle Oconee River with a proposed 48-inch ductile iron pipe (DIP) and new 9ft diameter precast structures. This shall include the installation of approximately 4,250 linear feet (LF) of 48-inch Ductile Iron Pipe (DIP), approximately 50 linear feet (LF) of 16-inch Ductile Iron Pipe (DIP), approximately 200 linear feet (LF) of 12-inch Ductile Iron Pipe (DIP), and 400 linear feet of 72-inch casings with anchors for stream crossings (some jack and bore), and 26 precast concrete manholes. This work starts at the Middle Oconee Water Reclamation plant and ends in the vicinity of the Macon Highway Bridge over the Middle Oconee. Some of this work shall be new trench work located parallel to the existing facilities, most shall be same trench replacement. There is one approximately 160 linear foot (LF) jack and bore under Macon Highway. All interconnections to the truck line shall be replaced a minimum 50 linear feet (LF) up stream from the trunk line with 12-inch Ductile Iron Pipe (DIP) or larger and a manhole installed. Along with this, work shall include erosion control and landscaping, several creek crossings, groundwater dewatering, as well as repair or replacement of items such as pavement, sidewalk, fences, and curbs. This work shall require large scale bypass pumping for the duration of the project. Work includes traffic control and requires larger scale bypass pump arounds for the duration of the project. Summary: The work t |
Original sector | Construction / Public Works |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Procurement Registry |
URL |
More Details
Record type | Tender |
Sector | Bridge, Road, Car parking, Cement, Metal, Power Transmission, Automotive, Water Supply and Storage, Power Generation (CCGT), Government, Waste Processing and Treatment |
Article published date | 2026-10-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Bridge tenders in United States
- SB013-26 Raised Intersections for Crogan Street at Perry Street and Clayton Street at Pike Street
- Road Work Bids- Resurface Macgruder Road
- FY26-CP-E15 Professional Services for Construction Engineering & Inspection
- 26-272 Deans Bridge Road MSW Landfill Phase III, Stage II South Cell 2 - Phase 1
- Road Widener
- New Front Mounted Broom
- T32-D1-Bridge-SR 347 Hall-186668
- T32-D6-Bridge-A1Cherokee SR417 Ex20-186812
