logo

RFQ - Airport FAA Tower Window Replacement

Sector: Geothermal • Location: Massachusetts, United States of America

Source: Massachusetts Purchasing Group

Tender
Closed

This Scope of Work defines the requirements for the removal and replacement of an existing window at the FAA Air Traffic Control Tower at Nantucket Memorial Airport ( ACK ). The Contractor shall furnish all labor , materials , equipment , supervision , and coordination required to complete the work safely while m

Status
Closed
Sector
Geothermal, Metal, Airport, Wind, Aerospace & Defense, Steel, Water Supply and Storage, Manufacturing (Industrial), Commercial
Location
Massachusetts, United States of America
Updated
3 Nov 2026
Source
Massachusetts Purchasing Group

ConstructChat

Ask ConstructChat about RFQ - Airport FAA Tower Window Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “RFQ - Airport FAA Tower Window Replacement” is a tender record in Taiyo, linked to the Geothermal sector. It is issued for works, goods, or services related to Massachusetts, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

This Scope of Work defines the requirements for the removal and replacement of an existing window at the FAA Air Traffic Control Tower at Nantucket Memorial Airport ( ACK ). The Contractor shall furnish all labor , materials , equipment , supervision , and coordination required to complete the work safely while maintaining continuous air traffic control operations and complying with all FAA , airport , and federal facility requirements . This project must be an FAA - approved window system that provides optical clarity , structural integrity , weather resistance , and thermal performance suitable for a coastal , high - wind , and salt - air environment , without disruption to airport or air traffic operations . Note for Glass Setting : A polysulfide - based sealant ( Thiokol ) shall be used to caulk all aluminum joints , whether butt or miter , to ensure a weather - tight seal . The exact glass dimensions shall be field verified by the Contractor . Final measurements will be determined during a site visit prior to fabrication and installation . Glazing Specification The Contractor shall furnish and install a multi - layer laminated insulating glass unit meeting the following minimum requirements : • Configuration : o 1 / 2 " Heat - Strengthened or Annealed Glass o 1 / 2 " Air Space with Aluminum Dual Seal Spacer , Argon - Filled o 1 / 4 " Laminated Glass with 0 . 090 " Hurricane - Resistant PVB Interlayer o 1 / 4 " Laminated Glass ( interior lite ) • Total Assembly : Five ( 5 ) layers of glass including interlayers • Interlayer : Trisofol or approved equal hurricane - grade PVB ( 0 . 090 ") • Spacer : Aluminum dual - seal system • Gas Fill : Argon Regulatory and Compliance Requirements : All work shall comply with the following , at a minimum : • FAA Orders , Engineering Standards , and Facility Safety Requirements • Federal Aviation Regulations ( FAR ) • FAA security , badging , and escort requirements • Nantucket Memorial Airport ( ACK ) access and operational rules • Manufacturer installation specifications No deviations shall be permitted without written approval from the FAA Contracting Officer or authorized FAA Representative . Pre - Work Coordination • Coordinate schedule with FAA facility management and airport operations to prevent disruption of air traffic control activities • Attend pre - work meeting with FAA and airport representatives • Submit a site - specific work plan and safety plan for FAA approval • Verify existing window dimensions , glazing type , framing conditions , and access requirements • Submit product data and shop drawings for FAA approval prior to fabrication or installation Window Removal • Protect all ATCT interior equipment , consoles , electronics , and finishes • Implement foreign object debris ( FOD ) prevention measures • Safely remove the existing window , frame , sealants , and fasteners • Ensure removal activities do not compromise tower operations or weather protection Window Replacement • Furnish and install a new FAA - approved replacement window system designed for : o High wind loads and coastal exposure o Salt - air corrosion resistance o Optical clarity with minimal distortion o Thermal efficiency and UV protection • Install new framing , anchorage , glazing , gaskets , and hardware • Ensure proper alignment , fit , and secure attachment per FAA and manufacturer requirements Sealing and Weatherproofing • Apply FAA - approved sealants and flashing systems • Ensure complete air - tight and water - tight installation • Prevent water intrusion , condensation , and air leakage under coastal weather conditions Testing and Inspection • Inspect installation for compliance with FAA standards and manufacturer specifications • Verify window performance , fit , finish , and sealing • Address and correct any deficiencies identified during inspection Cleanup and Restoration • Remove all debris , tools , and materials from FAA property daily • Dispose of removed window materials in accordance with federal and local regulations

Location

Country

United States of America (USA)

State

Massachusetts

Source

Source

Massachusetts Purchasing Group

URL

More Details

Record type

Tender

Sector

Geothermal, Metal, Airport, Wind, Aerospace & Defense, Steel, Water Supply and Storage, Manufacturing (Industrial), Commercial

Article published date

2026-05-02

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender