RFQ for AE Services Capital Complex Roof Replacements - Various A / E #' s
One of 3,973 tenders Taiyo tracks in Montana.
Source: Montana Purchasing Group
The Architecture & Engineering Division is accepting qualifications for architectural and engineering services for multiple roof replacement projects . Each project number will constitute a separate contract . Project Scope : 2023 - 30 - 09 DPHHS 111 N Sanders – Roof & Mechanical Replacement - Total Project Budget : $ 1 , 309 ,
- Status
- Closed
- Sector
- Raw Materials, Metal, Commercial
- Location
- Montana, United States of America
- Updated
- 3 Nov 2026
- Source
- Montana Purchasing Group
ConstructChat
Ask ConstructChat about RFQ for AE Services Capital Complex Roof Replacements - Various A / E #' s
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Architecture & Engineering Division is accepting qualifications for architectural and engineering services for multiple roof replacement projects . Each project number will constitute a separate contract . Project Scope : 2023 - 30 - 09 DPHHS 111 N Sanders – Roof & Mechanical Replacement - Total Project Budget : $ 1 , 309 , 099 This project will remove abandoned HVAC equipment , replace damaged roof decking , install new roof insulation and membrane . Mechanical equipment , vents , drains and hatches will be reconfigured to allow for additional roofing insulation . Two high efficiency cooling / condensing units with requisite plumbing , piping and controls will be installed with airside equipment . For additional description please refer to the attached MR - 04 write up from the 2024 - 2025 LRBP Book . Budget available for Construction : The construction cost is estimated at $ 1 , 178 , 189 . Project Scope : 2023 - 30 - 10 FWP Headquarters Roof Replacement - Total Project Budget : $ 289 , 695 This project will replace the existing upper copper roof with new prefinished standing seam metal , improve insulation below roof to promote uniform thawing and install new ice and snow guards . The skylight adjacent to the upper roof will be removed and the slope below the upper roof will be modified to allow proper drainage . In addition , 400 square feet of lower roof will be replaced . For additional description please refer to the attached MR - 05 write up from the 2024 - 2025 LRBP Book . Budget available for Construction : The construction cost is estimated at $ 260 , 725 Project Scope : 2025 - 30 - 13 Capital Complex Roof Replacement - Total Project Budget : $ 2 , 600 , 000 This project will replace the existing roofing materials down to the structural deck and replace them with systems chosen to provide maximum protection and energy efficiency for each roofing condition . The buildings include the Scott Hart Building , Main Plant , with the Cogswell Building being removed from the scope of this RFQ and Project . As budget allows other buildings prioritized by the department , include the Mazurek Building , the Livestock Building and the existing Heritage Center ( South Roof only ). For additional description please refer to the attached CD - 11 write up from the 2026 - 2027 LRBP Book . Budget available for Construction : The construction cost is estimated at $ 2 , 200 , 000 |
Location
Country | United States of America (USA) |
State | Montana |
Source
Source | Montana Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Raw Materials, Metal, Commercial |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Raw Materials tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Hay Cutting and Removal for Jordan Farm and Coleman Farm
- Antiscalant Chemical
- As-Needed Sewer Inspection (FY23) [BID TABULATION]
- Landscaping (C-27 License), San Francisco, San Mateo, Santa ...
- Van Ness Avenue Auxiliary Water Supply System Upgredes
- Sunol Valley Water Treatment Plant Ozonation
- Oceanside Water Pollution Control Plant Digester Gas Utiliza...
