Richmond Street Sewer & Water Upgrade
One of 2,790 tenders Taiyo tracks in New Hampshire.
Source: New Hampshire Purchasing Group
The City of Dover , New Hampshire is requesting proposals to provide construction labor , equipment , and supervision to complete sewer and water upgrades on Richmond Street . Scope of Work : 1 .) Install new SDR35 PVC sewer main piping as required . 2 .) Install new SDR 35 PVC sewer services as required , from
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Waste Processing and Treatment, Government
- Location
- New Hampshire, United States of America
- Updated
- 3 Nov 2026
- Source
- New Hampshire Purchasing Group
ConstructChat
Ask ConstructChat about Richmond Street Sewer & Water Upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The City of Dover , New Hampshire is requesting proposals to provide construction labor , equipment , and supervision to complete sewer and water upgrades on Richmond Street . Scope of Work : 1 .) Install new SDR35 PVC sewer main piping as required . 2 .) Install new SDR 35 PVC sewer services as required , from new main to ROW . 3 .) Install new sewer manholes as required . 4 .) Furnish and install required benching for new sewer manholes . 5 .) Complete testing on all new sewer manholes and sewer mains as noted in Attachment E . 6 .) Replace all water service lines from the existing corporation valves to a new curb stop . 7 .) Install new water main , gate valves , thrust blocks and all other necessary components to provide a complete system as shown in Attachment C . 8 .) New water main to pressure tested and disinfected per Attachment E Permitting , Licensing , and Construction Guidance and Standards . 9 .) Contractor to install temporary water system per Attachment F Temporary Water Plan , to be put into service prior to disruption to the existing permanent water service . 10 .) Provide trucking , excavation , labor and compaction as required . Compaction testing on trench fill to be supplied by City of Dover . 11 .) Perform trench paving with base course mix in areas where existing asphalt is disturbed . 12 .) Perform Coring / infill connection to existing structures to remain , as required . 13 .) Reset any curbing and reconstruct any sidewalks impacted by this work . 14 .) Remove and dispose of any material noted for removal in Attachment C , including excess soil . 15 .) Install flowable fill for any sewer piping that is not removed and is abandoned in place . 16 .) Furnish and install brick and mortar as necessary to set city furnished cover and frame to grade . 17 .) Remove and restore any fencing as needed that is disturbed as a result of the project . 18 .) Adequately support and maintain all utilities , including underground electrical utilities in the construction area . 19 .) Setup and maintain a temporary sewer bypass as needed to facilitate installation of new main . 18 .) Setup and maintain necessary erosion controls . 20 .) Setup and maintain all required construction signage per the city provided traffic control plan , signage to be provided by the city . 21 .) Provide oversight of city supplied flagging crew . Additional Contractor Responsibilities : • Dewatering as needed . • Compliance with Attachment D – The City of Dover ’ s Standard Details . • Compliance with Attachment E – The City of Dover ’ s Permitting , Licensing , and Construction Guidance and Standards . • As - Built GIS data submission upon completion . • Obtain Dig Safe clearance prior to excavating . • Ensure all handling of existing asbestos material is in accordance with all federal , state and local regulations . • Furnish all temporary water pipe and fittings as required . • Complete required pressure testing and disinfecting of the water system per Attachment C . • Assist in coordination with gas utility company as required . |
Location
Country | United States of America (USA) |
State | New Hampshire |
Source
Source | New Hampshire Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Road, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Waste Processing and Treatment, Government |
Article published date | 2026-04-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Road tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- NEW TIRES RETREADS AND TIRE SERVICES
- Professional Construction Engineering and Inspection CEI Services for the Williamson Boulevard Widening
- Lincoln Avenue Wascher to Killarney Preliminary Engineering Section 220065800PV
- KilleenFort Hood Regional Airport KFHRA Terminal Apron Rehabilitation Phase II
- IFB 947902022JM Screening 10 Asphalt Filter Stone 8 Granite Double Washed
- IFB 914202022AM Street Sweeper Parts and Brooms
- IFB 843402021AB Hay Alfalfa and Wheat Straw for Norfolk Zoo
