logo

Roadside & Guardrail Brush Spraying

One of 3,321 tenders Taiyo tracks in MITN.

Source: MITN Purchasing Group

Tender
Closed

General Specifications : 1 ) Contractor must meet insurance requirements . 2 ) Contractor must comply with applicable MDARD and EGLE rules and regulations . 3 ) Contractor must comply with applicable NPDES and ANC EGLE permits ; and comply with their rules and regulations . 4 ) Contractor will supply all equipment and

Status
Closed
Sector
Raw Materials, Residential, Road
Location
MITN, United States of America
Updated
3 Nov 2026
Source
MITN Purchasing Group

ConstructChat

Ask ConstructChat about Roadside & Guardrail Brush Spraying

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Roadside & Guardrail Brush Spraying” is a tender record in Taiyo, linked to the Raw Materials sector. It is issued for works, goods, or services related to MITN, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

General Specifications : 1 ) Contractor must meet insurance requirements . 2 ) Contractor must comply with applicable MDARD and EGLE rules and regulations . 3 ) Contractor must comply with applicable NPDES and ANC EGLE permits ; and comply with their rules and regulations . 4 ) Contractor will supply all equipment and materials . 5 ) All brush spraying will be as follows : ( a ) To an existing tree line , or ( b ) within the right - of - way ( 66 feet total or 33 feet from center of roadway in each direction ) unless stated otherwise . ( c ) Exclude yards where mowed and maintained to roadway . ( d ) Apply only acceptable chemicals near lakes and streams . 6 ) All guardrail spraying will be as follows : The minimum swath width for the herbicidal spraying along the guardrail shall be 4 feet with 3 feet of the swath located in front of the face of the guardrail and 1 foot of the swath located behind the face of the guardrail . 7 ) It will be the contractor ’ s responsibility to select an herbicide formulation and application rate capable of achieving a minimum of 90 % kill rate of ALL vegetation in the treatment area for a period of one growing season ending September 1st . The selected herbicide formulation shall consist of chemicals approved for use by the United States Environmental Protection Agency . 8 ) The contractor shall exercise extreme care to prevent damage to residential plantings ; vegetable or flower gardens ; farm crops ; or other desirable plants adjacent to the areas being sprayed . The contractorshall have the right to shut off the spray at any time he feels the application may cause damage . 9 ) Spraying locations are countywide . Work shall consist of brush - spraying areas that have been previously cut . 10 ) Bidding price structure to be based as follows : ( a ) Primary and Local roads - price per mile ( both sides of roadway ) ( b ) Guardrail spraying - price per foot

Location

Country

United States of America (USA)

State

MITN

Source

Source

MITN Purchasing Group

URL

More Details

Record type

Tender

Sector

Raw Materials, Residential, Road

Article published date

2026-05-14

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender