Roof Coating Renovation
Bids closed Mar 2026 · Oklahoma · Last reported Feb 2026
Source: Oklahoma Purchasing Group
• Prep old / existing roof as needed and install foam and silicone roof application . • Remove and / or vacuum rock and ballast off roof and prep for foam . This step will need to be done during off hours for the school . Evenings , weekends , etc . • Power wash existing membrane to remove all loose debris
- Status
- Closed
- Sector
- Steel, Power Generation (CCGT), Manufacturing (Industrial), Commercial
- Location
- Oklahoma, United States of America
- Updated
- 3 Nov 2026
- Source
- Oklahoma Purchasing Group
ConstructChat
Ask ConstructChat about Roof Coating Renovation
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | • Prep old / existing roof as needed and install foam and silicone roof application . • Remove and / or vacuum rock and ballast off roof and prep for foam . This step will need to be done during off hours for the school . Evenings , weekends , etc . • Power wash existing membrane to remove all loose debris as needed • It is assumed that the existing steel roof decking is generally in serviceable condition and suitable to receive the new roofing system . Minor areas of deteriorated decking may exist . • Removal and replacement of roof decking is not included in the base bid . • Provide a unit price per square foot for removal and replacement of deteriorated steel roof decking discovered during ballast removal and roof prep . • Contractor shall field verify existing deck type , depth , gauge , and structural conditions prior to ordering replacement materials . • Replacement decking shall be of equal or greater current structural capacity and shall comply with applicable building code requirements . • Unit price shall include removal and disposal of existing deck , temporary weather protection , furnishing and installation of new deck , fastening to existing structural framing , cutting and fitting at penetrations , and full coordination and integration with the new roofing system . • For purposes of unit price compensation , deteriorated roof decking shall be defined as decking exhibiting excessive corrosion , perforation , structural deformation , or other conditions resulting in a reduction of structural load - carrying capacity . Surface oxidation , minor rusting , staining , or cosmetic corrosion that does not impair structural performance shall not be considered deteriorated decking and shall not qualify for replacement under the unit price . • Contractor shall notify BAPS immediately upon discovery of deteriorated decking . Final quantity of roof decking and proposed materials must be inspected and approved by BAPS prior to installation . BAPS will approve the final quantities installed and replaced and these findings will be used to determine any necessary change orders . • Apply one and a half inch ( 1 ½ ”) of VFI or equivalent product type , closed cell polyurethane foam per factory specifications to entire roof area . • Apply 32 mils of one of the following silicone systems to entire surface area of foam : ( A ) VFI Sealguard 990 white silicone , ( B ) GacoFlex S20 series silicone coating , or ( C ) Everfoam silicone / SPF renovation system . Contractor shall specify which product will be used in the bid . Note : Consideration of alternative product types must be preapproved prior to bid opening and shall be accompanied by manufacturer specifications . • Broadcast silicone granules into top coating at 25 lbs per square . • Avoid spraying gas lines , conduit and AC drain lines . Special care to seal and coat around all penetrations , pitch pans and edge treatments • Apply roofing materials only when ambient temperatures are above 60 degrees and below 110 degrees , or as otherwise recommended by the manufacturer . |
Location
Country | United States of America (USA) |
State | Oklahoma |
Source
Source | Oklahoma Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Steel, Power Generation (CCGT), Manufacturing (Industrial), Commercial |
Article published date | 2026-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Steel tenders in United States of America
- Construction Materials Testing and Inspection Services for Thousand Oaks Boulevard Pedestrian Crossing CI 5398
- Street Construction Materials
- Jail Courthouse Walkway Project
- RFP 887702021MF Rapid Response Fire Boat for Norfolk FireRescue
- Millbrae Warehouse Loading Dock Repair
- Biosolids Digester Facilities - Southeast Treatment Plant T-...
- Marin Street Sewer Replacement - BID TABULATION
- Southeast Water Pollution Control Plant HVAC and Mechanical ...