Roof Repair
The scope, dates and status of this tender. A free account opens every field.
Source: California Purchasing Group
Gutter Repair : The Contractor shall set up necessary fall protection equipment . Remove existing gravel , stop metal preventing water from flowing freely towards gutter . Install new edge metal flush to existing edge metal . Prime and seal edge metal with extreme loading for structures ( ELS ) prior to nailing in
- Status
- Closed
- Sector
- Water Supply and Storage, Metal, Power Generation (CCGT), Commercial
- Location
- California, United States of America
- Updated
- 3 Nov 2026
- Source
- California Purchasing Group
ConstructChat
Ask ConstructChat about Roof Repair
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Gutter Repair : The Contractor shall set up necessary fall protection equipment . Remove existing gravel , stop metal preventing water from flowing freely towards gutter . Install new edge metal flush to existing edge metal . Prime and seal edge metal with extreme loading for structures ( ELS ) prior to nailing in place . Tie in edge metal flange conducting a three - course application using Burmesh and ELS . Flood new repair with gravel , and remove any debris , equipment , and material associated with the roofing repair . Field Repair : Evidence of roof leakage has been noted inside the building . The exact point of water entry has not been established . Contractor shall inspect the roof , identify the source ( s ) of the leak , and perform the repairs to prevent further water intrusion . All roof repairs will be guaranteed by the Contractor to prevent any future leakage . Set up necessary fall protection equipment . Scrape off existing gravel over the repair area and set aside to be reused . Remove existing repairs down to the deck . Inspect the deck for severe damage and replace if needed . Adhere two plies in power ply endure adhesive overlapping 12 inches minimum . Adhere cap sheet in power ply endure adhesive . Tie in new repair to the field conducting a three - course application using Burmesh and ELS . Flood new repair with gravel . Remove any debris , equipment , and material associated with the roofing repair . |
Location
Country | United States of America (USA) |
State | California |
Source
Source | California Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Metal, Power Generation (CCGT), Commercial |
Article published date | 2026-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
