Roof Replacement - A/E Construction Support Services
Sector: Government • Location: Chicago, Illinois, United States of America
Source: SAM.gov
The General Services Administration (GSA) requires the professional services of Wold Architects and Engineers to provide continuity for the construction phase of the roof replacement design previously developed by the firm. Although the construction solicitation has been publicized via SAM.gov and a site visit is imminent, the technical expertise of the original design firm is essential to address
- Status
- Closed
- Sector
- Government, Commercial, Residential, Water Supply and Storage
- Location
- Chicago, Illinois, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Roof Replacement - A/E Construction Support Services
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | award notice |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The General Services Administration (GSA) requires the professional services of Wold Architects and Engineers to provide continuity for the construction phase of the roof replacement design previously developed by the firm. Although the construction solicitation has been publicized via SAM.gov and a site visit is imminent, the technical expertise of the original design firm is essential to address specialized inquiries regarding specifications and to perform requisite construction oversight. While this project was initially slated for award in 2025 during the firm's active contract period, potential property disposition necessitated the cancellation of the original solicitation and the subsequent expiration of the firm's task order in December 2026. Alternative sources were considered; however, engaging a different Architect/Engineering (A/E) firm would result in substantial cost increases, significant schedule disruptions, and the following unacceptable risks: Fiscal Impact: Increased costs stemming from the liability and risk premiums associated with assuming professional responsibility for a design package authored by another firm. Liability Constraints: Anticipated contractual exclusions from a new firm refusing to validate or take ownership of the original design. Operational Delays: Extended procurement timelines required for an unfamiliar team to perform the necessary research to interpret the existing design. Information Attrition: Loss of institutional knowledge and critical engineering history established during the design phase. Technical Risk: Potential procurement errors resulting from a new team's lack of familiarity with previous engineering decisions. GSA cannot sustain further delays to the construction schedule. Expedited roof replacement is mandatory to remediate active water infiltration on the 6th floor, which has compromised the operational mission of the ATFE and forced them to move out of the space. Wold Architects and Engineers remains the sole entity possessing the comprehensive background data required for this phase, particularly as the original Government project personnel are no longer affiliated with the agency. |
Original sector | Professional, Scientific, and Technical Services |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Chicago |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Government, Commercial, Residential, Water Supply and Storage |
Article published date | 2026-05-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Government tenders in United States of America
- Sanitary Sewer Lateral Lining Pilot Program Section 230067500SA
- Fuel Tank Inspection and Repair Services
- HOUSEHOLD SINGLEUSE RECHARGEABLE BATTERY COLLECTION AND RECYCLING SERVICES
- Dual Trash and Recycling Receptacles
- Annual Inspection Testing of Aerial Devices and Digger Derricks
- 23B48LS Transit Bus Engines
- Heavy Duty Trucks and Equipment Parts and Accessories
- Automotive and Light Truck Parts and Accessories
