logo

Roof Replacement - North Campus

Sector: Water Supply and Storage • Location: Utah, United States of America

Source: Utah Purchasing Group

Tender
Closed

flashing at high - risk penetration and ponding points . • Debris Removal : Responsibility for the removal and legal disposal of all old roofing materials and job site cleanup . • Code Compliance : The project must comply with any applicable codes and requirements as adopted by the State of Utah and the City

Status
Closed
Sector
Water Supply and Storage, Geothermal, Commercial
Location
Utah, United States of America
Updated
3 Nov 2026
Source
Utah Purchasing Group

ConstructChat

Ask ConstructChat about Roof Replacement - North Campus

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Roof Replacement - North Campus” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to Utah, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

flashing at high - risk penetration and ponding points . • Debris Removal : Responsibility for the removal and legal disposal of all old roofing materials and job site cleanup . • Code Compliance : The project must comply with any applicable codes and requirements as adopted by the State of Utah and the City of North Logan . • Permitting : The contractor is responsible for obtaining all necessary building permits and scheduling required inspections with the local building department . • Thermal Resistance ( R - Value ): New insulation must meet or exceed the current statemandated R - value for Climate Zone 5 ( typically a minimum of R - 30 ). o Bidders must specify the type of insulation ( e . g ., Polyisocyanurate ) and the number of layers . Staggered joints are required for multiple layers to prevent thermal bridging and air leakage . • Tapered Insulation System : Where applicable , a tapered insulation system must be used to ensure positive drainage and eliminate standing water ( ponding ), especially in areas where the existing deck does not provide sufficient slope .

Location

Country

United States of America (USA)

State

Utah

Source

Source

Utah Purchasing Group

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Geothermal, Commercial

Article published date

2026-05-02

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender