Roof Replacement - North Campus
Sector: Water Supply and Storage • Location: Utah, United States of America
Source: Utah Purchasing Group
flashing at high - risk penetration and ponding points . • Debris Removal : Responsibility for the removal and legal disposal of all old roofing materials and job site cleanup . • Code Compliance : The project must comply with any applicable codes and requirements as adopted by the State of Utah and the City
- Status
- Closed
- Sector
- Water Supply and Storage, Geothermal, Commercial
- Location
- Utah, United States of America
- Updated
- 3 Nov 2026
- Source
- Utah Purchasing Group
ConstructChat
Ask ConstructChat about Roof Replacement - North Campus
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | flashing at high - risk penetration and ponding points . • Debris Removal : Responsibility for the removal and legal disposal of all old roofing materials and job site cleanup . • Code Compliance : The project must comply with any applicable codes and requirements as adopted by the State of Utah and the City of North Logan . • Permitting : The contractor is responsible for obtaining all necessary building permits and scheduling required inspections with the local building department . • Thermal Resistance ( R - Value ): New insulation must meet or exceed the current statemandated R - value for Climate Zone 5 ( typically a minimum of R - 30 ). o Bidders must specify the type of insulation ( e . g ., Polyisocyanurate ) and the number of layers . Staggered joints are required for multiple layers to prevent thermal bridging and air leakage . • Tapered Insulation System : Where applicable , a tapered insulation system must be used to ensure positive drainage and eliminate standing water ( ponding ), especially in areas where the existing deck does not provide sufficient slope . |
Location
Country | United States of America (USA) |
State | Utah |
Source
Source | Utah Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Geothermal, Commercial |
Article published date | 2026-05-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
