Roof Replacement Services in Modoc County
The scope, dates and status of this tender. A free account opens every field.
Source: California Purchasing Group
A . Contractor shall perform complete roof replacement for the Alturas MS , Office Crew Room ( approximately 5 , 630 square feet ( sq . ft .)). B . Contractor shall verify measurements prior to the start of work . C . Contractor shall refer to Caltrans 2025 Standard Specifications where applicable . D . Contractor shall
- Status
- Closed
- Sector
- Residential, Metal, Wind, Commercial
- Location
- California, United States of America
- Updated
- 3 Nov 2026
- Source
- California Purchasing Group
ConstructChat
Ask ConstructChat about Roof Replacement Services in Modoc County
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | A . Contractor shall perform complete roof replacement for the Alturas MS , Office Crew Room ( approximately 5 , 630 square feet ( sq . ft .)). B . Contractor shall verify measurements prior to the start of work . C . Contractor shall refer to Caltrans 2025 Standard Specifications where applicable . D . Contractor shall perform the following task after receiving a Notice to Proceed from Caltrans Contract Manager in writing : 1 ) Contractor shall remove and legally dispose of the old Corrugated Metal Roofing System . 2 ) Contractor shall ensure insulation is not exposed to precipitation or left exposed at the end of each workday . If any damage is done to the existing insulation , insulation shall be fixed and installed according to the manufacturer ’ s recommendation . 3 ) Contractor shall provide a minimum of 24 - gauge Metal Standing Seam Roof . 4 ) Contractor is responsible for pitch , snow load , and rib height per manufacturer standards . 5 ) Contractor shall ensure that the roofing colors closely match one of the roofing colors present on existing structures . If no other structure is present , stand - alone structure , forest green is preferred . Color matching and roofing colors shall be determined and approved by Caltrans Contract Manager prior to the commencement of work . 6 ) Contractor shall ensure that snow bar systems , per manufacturer instructions , are to be omitted . 7 ) Contractor shall remove all flashings , counterflashing , pipe flashings , vents , and like components necessary for new installation . 8 ) Contractor shall remove all four ( 4 ) round turbine roof vents and replace them with four ( 4 ) passive ridge caps for ventilation . 9 ) Contractor shall ensure that areas with unfinished roofing will not be exposed to precipitation or left exposed at the end of each workday . 10 ) Contractor shall use new fasteners to properly secure the new Standing Seam Metal Roof . 11 ) Contractor shall provide all required materials to replace the roofing and ridge caps . 12 ) Contractor shall provide product warranty / guarantee paperwork to Caltrans Contract Manager with final billing paperwork . E . Contractor shall complete and invoice all work within four ( 4 ) months of the Notice to Proceed unless approved in writing by Caltrans Contract Manager . |
Location
Country | United States of America (USA) |
State | California |
Source
Source | California Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Residential, Metal, Wind, Commercial |
Article published date | 2026-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
