Roof Replacements – BC18 and BC24 – Beaver Creek Institution - Minimum
One of 10,000+ tenders Taiyo tracks in Canada.
Source: Canada Buy and Sell
The Correctional Service Canada (CSC) requires a qualified contractor to complete the Roof Replacement for buildings BC18 (Unit 2) and BC24 (Unit 3) at Beaver Creek Institution.
Objectives: CSC requires a qualified contractor to replace the existing aged asphalt shingle roof with a durable standing seam roofing system that enhances the structural integrity, improves weather resistance and redu
- Status
- Closed
- Sector
- Road, Steel, Wind, Manufacturing (Industrial), Commercial, Water Supply and Storage, Metal
- Location
- Canada
- Updated
- 3 Nov 2026
- Source
- Canada Buy and Sell
ConstructChat
Ask ConstructChat about Roof Replacements – BC18 and BC24 – Beaver Creek Institution - Minimum
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Correctional Service Canada (CSC) requires a qualified contractor to complete the Roof Replacement for buildings BC18 (Unit 2) and BC24 (Unit 3) at Beaver Creek Institution. Objectives: CSC requires a qualified contractor to replace the existing aged asphalt shingle roof with a durable standing seam roofing system that enhances the structural integrity, improves weather resistance and reduces long term maintenance costs. Deliverables: a)The Contractor must ensure that all employees performing work at elevated heights have a valid Working from Heights certification. b)The Contractor must provide all required equipment, including their own equipment for working at heights to complete the work in the project. c)Measurement & Verification 1.Verify all roof dimensions and conditions prior to ordering materials and commencing work. d)Preparation 1.Inspect the roof deck and structure for damage, rot and deficiencies. Report any necessary repairs and provide a quote for additional work. 2. Remove existing vents. 3.Ensure the roof deck is clean and suitable for installation. e) Installation 1.Supply and install a full-coverage synthetic roof underlayment beneath the metal roofing system across all roof areas i. Underlayment must be premium grade, non-perforated synthetic material suitable for use under metal roofing systems ii. Minimum material weight of approximately 200 g/m² (or equivalent) iii. Underlayment must provide a continuous secondary water-shedding barrier over the entire roof deck iv. Material must meet or exceed industry standards for water resistance, tear strength, UV stability, and slip resistance v. Installation must be completed in strict accordance with manufacturer’s specifications vi. Contractor must provide a minimum two (2) year transferable labour warranty covering installation of the underlayment system 2. Install ¾” strapping at manufacturer recommended spacing and orientation for the standing seam system. 3.Install 2” drip edge around the entire perimeter. 4. Supply and install the new snap-lock standing seam roof system, including all accessory components: i. Panels: 24” wide, minimum 24-gauge (0.7mm) gauge thickness. ii. Finish: Hot-dipped zinc coated steel with factory applied colour finish. iii. Attachment: Hidden clip system; all fasteners and components must be corrosion resistant. 5. Supply and install new roof vents, flashing and transitions to match the new roof colour. 6. Provide colour samples to the Site Authority for approval prior to fabrication. 7. Install appropriate sealants for a weather tight finish. 8. Supply and install snow guards at all roof edge areas to prevent snow and ice overhangs and uncontrolled shedding i. Installation must include continuous coverage along the full perimeter of all roof sections, not limited to doors or designated walkways ii. Snow guard layout and spacing must be designed to provide effective snow retention across all roof edges iii. System must be compatible with the installed metal roofing system and designed to avoid damage to roof panels or fasteners iv. Installation must be completed in accordance with accepted industry best practices for metal roofing systems and to maintain roof system integrity and performance f) Compliance & Quality 1. All materials and installation must comply with the manufacturer’s specifications. 2. Provide written warranties for materials, finish, workmanship and service life. g) Site Management 1. Protect surrounding property during work. 2. Maintain a clean worksite and secure materials to prevent wind damage. 3. Dispose of removed roofing material in accordance with environmental and local regulations. 4. The building will be occupied during installation, so the entrance must be protected against falling material. The emergency exits must remain usable throughout the project. |
Budget |
Location
Country | Canada |
Source
Source | Canada Buy and Sell |
URL |
More Details
Record type | Tender |
Sector | Road, Steel, Wind, Manufacturing (Industrial), Commercial, Water Supply and Storage, Metal |
Article published date | 2026-10-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Road tenders in Canada
- Provinciale - fournir des services professionnels pour des études de circulations
- Acquisition of a new tanker truck equipped with an articulated arm (Transport equipment and spare parts)
- Supply and delivery of a chassis-cab truck without box (Transport equipment and spare parts)
- 4103-23-AP06 - Automated saw for manufacturing asphalt test specimens in the laboratory for the Infrastructure Materials Department (Scientific Instruments)
- Côte-Nord / Micoua - Services déneigement - Route accès et Campement Uaueiashtan
- Côte-Nord / Romaine 4 - R4-08-10 Travaux civils et d'excavation le long de diverses routes - Addenda 4
- Côte-Nord / Romaine 4 - R4-08-10 Travaux civils et d'excavation le long de diverses routes - Addenda 1
- Côte-Nord / Manic 3-Remplacement ponceaux route centrale
