Roofs and Gutter Replacement
Sector: Water Supply and Storage • Location: Arkansas, United States of America
Source: Arkansas Purchasing Group
This Quote Bid is issued by the Department of Parks Heritage and Tourism for the Parks Operations division to obtain pricing and a contract for a Major Maintenance project . The extent of this project involves comprehensive removal and replacement of damaged , leaking roofs and deteriorated gutters across t
- Status
- Closed
- Sector
- Water Supply and Storage, Metal, Cement, Telecommunications, Commercial, Hotel
- Location
- Arkansas, United States of America
- Updated
- 3 Nov 2026
- Source
- Arkansas Purchasing Group
ConstructChat
Ask ConstructChat about Roofs and Gutter Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | This Quote Bid is issued by the Department of Parks Heritage and Tourism for the Parks Operations division to obtain pricing and a contract for a Major Maintenance project . The extent of this project involves comprehensive removal and replacement of damaged , leaking roofs and deteriorated gutters across three buildings located within Petit Jean State Park . The objective is to fully replace and restore the roofs , gutters , and their structural components to a safe , functional , and code - compliant condition . Building Number 08 . 02 ; Specifications for 8 ” box Gutters with leaf guard on OTF building and CNC breezeway Contractor to Provide : 1 . Contractor shall be responsible for all safety barriers to keep bystanders out of work areas and at a safe distance . 2 . Contractor shall perform the removal of existing gutters as well as the removal of all debris from project site . 3 . Contractor shall furnish all Labor , tools , Equipment and Materials to install new 8 ” box style seamless gutters and new downspouts and new leaf box brand product on gutters ( Approx . 150 ’ lin . Ft .) and new downspouts installed in the existing locations . Note that this also includes replacing 16 ’ lin . Ft . of 6 ” gutter on the CNC breezeway . 4 . Contractor shall configure all downspouts with elbows so that the downspouts can be strapped to the building and a min . of two straps . 5 . Contractor shall be responsible for making sure that they use the proper gutter hangers and that gutters are the appropriate angle and distance form fascia to maximize water collection . 6 . Contractor shall install concrete splash blocks at all downspouts to divert water away from building . Gutters color shall be white . 7 . Contractor shall be responsible for making sure that the proper hardware is used and all end caps , elbows , drop outlets and inside and outside corners and straps are attached with proper fasteners . 8 . Contractor shall install the entire gutter system to meet manufacturer ’ s specifications and any state , county , and city building codes . Building Number 08 . 03 ; Specifications : For new 26 - gauge metal PBR panel roofing with exposed fasteners Contractor to Provide : 1 . Contractor shall perform the removal of existing metal . And the removal of all debris from project site . And to cordon off work areas where guests could possibly get injured . 2 . Sign shop storage - contractor shall install new ( 26 ga )( 0 . 48mm ) metal PBR ( purlin bearing rib ) panel roofing with exposed fasteners roof system with galvalume finish with 40 - year warranty and 10 - year warranty on labor with a WMP - 50 ( premium heavy - duty insulation ) underlayment over entire roofing surface . Approx . ( 3 ’ 060 sf .) and Approx . ( 104 ’ lin . Ft . rake trim ) and Approx . ( 60 ’ lin . Ft . Ridge ). Note new roof shall include all trim and accessories required to complete the roof . 3 . Contractor shall Note that this also includes breezeway between buildings this includes removing metal Approx . ( 192 ’ lin . ft .) and installing new wood decking and then installing TPO roofing membrane glued over decking with all trim and accessories required to complete the roof . 4 . Contractor shall install the entire roof system to meet manufacturer ’ s specifications and any state , county , and city building codes . 5 . Contractor shall install a butyl tape under PBR panel overlaps to prevent leaks or equivalent . 6 . Contractor shall install new roof vent boots / jacks . Roof vent boots & flashing to best match roofing color . Roofing color galvalume . 7 . Contractor shall move any plumbing vents pipes that are not metal or cast and are too close to metal ribs preventing proper installation of boots / jacks and flashings . 8 . Contractor shall install fittings / elbows to move the pipes to provide proper installation of all boots / jacks and flashing . 9 . Contractor shall be responsible for re - sealing all roof penetrations . 10 . Contractor shall be responsible for removing cable or satellite dishes and no dishes shall be attached to new metal roof . 11 . Contractor shall remove and reinstall and protect all gutters and down spouts , if applicable . 12 . Photographs may be requested by Greg Hart during the installation . Building Number 08 . 04 ; Specifications for new 26 - gauge metal PBR panel roofing with exposed fasteners Contractor to Provide : 1 . Contractor shall perform the removal of existing metal . And the removal of all debris from project site . And to cordon off work areas where guests could possibly get injured . 2 . Contractor shall install new ( 26 ga )( 0 . 48mm ) metal PBR ( purlin bearing rib ) panel roofing with exposed fasteners roof system with galvalume finish with 40 - year warranty and 10 - year warranty on labor and replace any bad insulation to best match existing Approx . ( 2 ’ 160 sf .) and Approx . ( 72 ’ lin . Ft . rake trim ) and Approx . ( 60 ’ lin . Ft . Ridge ). Note new roof shall include all trim and accessories required to complete the roof . 3 . Contractor shall install the entire roof system to meet manufacturer ’ s specifications and any state , county , and city building codes . 4 . Contractor shall install a butyl tape under PBR panel overlaps to prevent leaks or equivalent . 5 . Contractor shall install new roof vent boots / jacks . Roof vent boots & flashing to best match roofing color . Roofing color galvalume . 6 . Contractor shall move any plumbing vents pipes that are not metal or cast and are too close to metal ribs preventing proper installation of boots / jacks and flashings . 7 . Contractor shall install fittings / elbows to move the pipes to provide proper installation of all boots / jacks and flashing . 8 . Contractor shall be responsible for re - sealing all roof penetrations . 9 . Contractor shall be responsible for removing cable or satellite dishes and no dishes shall be attached to new metal roof . 10 . Contractor shall remove and reinstall and protect all gutters and down spouts , if applicable . 11 . Photographs may be requested by Greg Hart during the installation . Additional / Other : • All Bidders are required to have an on - site visit scheduled with the Park Superintendent . Signed Site Visit Verification Form is required for bid submission and acceptance . Make appointment with Park for site visit . • VENDOR IS RESPONSIBLE FOR ALL MEASUREMENTS BEING VERIFIED . |
Location
Country | United States of America (USA) |
State | Arkansas |
Source
Source | Arkansas Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Metal, Cement, Telecommunications, Commercial, Hotel |
Article published date | 2026-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
