logo

Rosebud Lift Station Construction

Sector: Water Supply and Storage • Location: Rosebud, South Dakota, United States of America

Source: SAM.gov

Tender
Solicitation

Solicitation: Rosebud LiftStation Construction Location: 1319 Soldier Creek Road,Rosebud, SD 57570 County: Todd POP: 120 calendar days Construction Magnitude: Between$500,000 and $1,000,000 Contract Type: firm-fixed-priced TERO: TERO is applicable. See SectionH.50. Goal: The existing lift station has been inplace since the early 1990s. Since its cre-ation the hospital anticipates increased ex-pans

Status
Closed
Sector
Water Supply and Storage, Hospital, Residential, Road, Waste Processing and Treatment, Commercial
Location
Rosebud, South Dakota, United States of America
Updated
3 Nov 2026
Source
SAM.gov

ConstructChat

Ask ConstructChat about Rosebud Lift Station Construction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Rosebud Lift Station Construction” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to Rosebud, South Dakota, United States of America.

Participants

Not available for this record.

Status

Original status

solicitation

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Solicitation: Rosebud LiftStation Construction Location: 1319 Soldier Creek Road,Rosebud, SD 57570 County: Todd POP: 120 calendar days Construction Magnitude: Between$500,000 and $1,000,000 Contract Type: firm-fixed-priced TERO: TERO is applicable. See SectionH.50. Goal: The existing lift station has been inplace since the early 1990s. Since its cre-ation the hospital anticipates increased ex-pansion in the emergency department,added on Tribal programs (dialysis, detox,Tribal Health Administration Building),added on 19 more quarters units, and is an-ticipating adding an additional 23 quartersunits. The existing pumps are facing re-placement every 1-2 years due to the unan-ticipated growth, but due to the growth weneed to consider increasing the capacity ofthe wet well. In addition to switching fromstandard submersible pumps to chopperpumps to accommodate the random ob-jects that get flushed into the system. InJuly both pumps ended up failing and theyhad to not only replace the pumps but payfor sewage disposal to circumvent overflow. A separate project is in the works to beginremediating/replacing damaged sewermains due to inflow and infiltration. This construction solicitation will requirethe full removal and replacement of the liftstation for the Rosebud complex. The exist-ing lift station provides wastewater serviceto the hospital quarters units, and severaltribal program buildings. Once installationis complete the new lift station will take thefull sanitary load for the area currently be-ing serviced by the existing lift station andbe sized to handle expansion in the future.Then the existing lift station consisting of the wet well, dry well, pumps and pipingwill be demolished. The new lift station willconsist of a wet well, a dry well, installationof chopper pumps, and force main connec-tion. This project will also include a newcontrol system to allow the facility to moni-tor flow into the lift station and the status ofthe equipment.

Original sector

Construction

Location

Country

United States of America (USA)

State

South Dakota

City

Rosebud

Source

Source

SAM.gov

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Hospital, Residential, Road, Waste Processing and Treatment, Commercial

Article published date

2026-01-28

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender