Ross Swing Bridge Penzance - Full Refurbishment
The scope, dates and status of this tender. A free account opens every field.
Source: Open Contracting Data Standard (OCDS)
Corserv Solutions Ltd - Cormac division wish to appoint a suitably experienced and qualified contractor to undertake full refurbishment of Ross Swing Bridge Penzance under NEC3 Option A. Works as follows: • Removal of bridge via barge to said dockyard, works to take place off site. • Shot blasting and refurbishment, re-painting of bridge structure, masts and masts stays to be completed. • Fabricat
- Status
- Closed
- Sector
- Steel, Chemical (Industrial), Manufacturing (Industrial), Bridge, Commercial
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Open Contracting Data Standard (OCDS)
ConstructChat
Ask ConstructChat about Ross Swing Bridge Penzance - Full Refurbishment
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Corserv Solutions Ltd - Cormac division wish to appoint a suitably experienced and qualified contractor to undertake full refurbishment of Ross Swing Bridge Penzance under NEC3 Option A. Works as follows: • Removal of bridge via barge to said dockyard, works to take place off site. • Shot blasting and refurbishment, re-painting of bridge structure, masts and masts stays to be completed. • Fabrication of new steel deck plates which will then be galvanised. Work to be carried out within a dockyard. Installation will take place once bridge is back in situ in Penzance. • Fabrication of galvanised new parapet. Installation will take place once bridge is back in situ in Penzance. • Fabrication of new steel footway which will be bonded to new steel deck plate, as per detail. • Footway to be surface using Calcined Bauxite, to be installed by fabricator. • Footway to have polyethylene load bearing foam installed. The bridge is to be barged offsite from Penzance in one piece, to undergo refurbishment in a controlled environment for a period no greater than 6 weeks and returned to site in Penzance by barge”. The intention is to award the contract to the most economically advantageous tenderer based on 40% Quality and 60% Commercial. To access the online question template and supporting documents, express an interest and then click the "start my response" button |
Location
Country | United Kingdom (UK) |
Source
Source | Open Contracting Data Standard (OCDS) |
URL |
More Details
Record type | Tender |
Sector | Steel, Chemical (Industrial), Manufacturing (Industrial), Bridge, Commercial |
Article published date | 2026-03-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Steel tenders in United Kingdom
- Structured Guarantees
- Framework for the Hire of Large Plant (some with Operator)
- Appointment of an Exhibition and Interpretation Manufacture and Installation Supplier
- Loan Management System
- PRELIMINARY MARKET ENGAGEMENT - Carnarvon Terrace Construction Regeneration Project
- C14801 - Manufacture & Supply of SRP Products
- Waterfront Connectivity Walkway
- Minor Aids and Adaptations Delivery
