logo

Ross Swing Bridge Penzance - Full Refurbishment

The scope, dates and status of this tender. A free account opens every field.

Source: Open Contracting Data Standard (OCDS)

Tender
Active

Corserv Solutions Ltd - Cormac division wish to appoint a suitably experienced and qualified contractor to undertake full refurbishment of Ross Swing Bridge Penzance under NEC3 Option A. Works as follows: • Removal of bridge via barge to said dockyard, works to take place off site. • Shot blasting and refurbishment, re-painting of bridge structure, masts and masts stays to be completed. • Fabricat

Status
Closed
Sector
Steel, Chemical (Industrial), Manufacturing (Industrial), Bridge, Commercial
Location
United Kingdom
Updated
3 Nov 2026
Source
Open Contracting Data Standard (OCDS)

ConstructChat

Ask ConstructChat about Ross Swing Bridge Penzance - Full Refurbishment

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Ross Swing Bridge Penzance - Full Refurbishment” is a tender record in Taiyo, linked to the Steel sector. It is issued for works, goods, or services related to United Kingdom.

Participants

Not available for this record.

Status

Original status

active

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Corserv Solutions Ltd - Cormac division wish to appoint a suitably experienced and qualified contractor to undertake full refurbishment of Ross Swing Bridge Penzance under NEC3 Option A. Works as follows: • Removal of bridge via barge to said dockyard, works to take place off site. • Shot blasting and refurbishment, re-painting of bridge structure, masts and masts stays to be completed. • Fabrication of new steel deck plates which will then be galvanised. Work to be carried out within a dockyard. Installation will take place once bridge is back in situ in Penzance. • Fabrication of galvanised new parapet. Installation will take place once bridge is back in situ in Penzance. • Fabrication of new steel footway which will be bonded to new steel deck plate, as per detail. • Footway to be surface using Calcined Bauxite, to be installed by fabricator. • Footway to have polyethylene load bearing foam installed. The bridge is to be barged offsite from Penzance in one piece, to undergo refurbishment in a controlled environment for a period no greater than 6 weeks and returned to site in Penzance by barge”. The intention is to award the contract to the most economically advantageous tenderer based on 40% Quality and 60% Commercial. To access the online question template and supporting documents, express an interest and then click the "start my response" button

Location

Country

United Kingdom (UK)

Source

Source

Open Contracting Data Standard (OCDS)

URL

More Details

Record type

Tender

Sector

Steel, Chemical (Industrial), Manufacturing (Industrial), Bridge, Commercial

Article published date

2026-03-16

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender