logo

ROYAL OAK HIGH SCHOOL & ROYAL OAK MIDDLE SCHOOL GYMNASIUM COOLING / HVAC

Location: MITN, United States of America

Source: MITN Purchasing Group

Tender
Closed

A . Install thermowells with socket extending a minimum of 2 inches into fluid and in vertical position in piping tees . B . Install thermowells of sizes required to match thermometer connectors . Include bushings if required to match sizes . C . Install thermowells with extension on insulated piping . D . Fill t

Status
Closed
Location
MITN, United States of America
Updated
3 Nov 2026
Source
MITN Purchasing Group

ConstructChat

Ask ConstructChat about ROYAL OAK HIGH SCHOOL & ROYAL OAK MIDDLE SCHOOL GYMNASIUM COOLING / HVAC

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “ROYAL OAK HIGH SCHOOL & ROYAL OAK MIDDLE SCHOOL GYMNASIUM COOLING / HVAC” is a tender record in Taiyo. It is issued for works, goods, or services related to MITN, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

A . Install thermowells with socket extending a minimum of 2 inches into fluid and in vertical position in piping tees . B . Install thermowells of sizes required to match thermometer connectors . Include bushings if required to match sizes . C . Install thermowells with extension on insulated piping . D . Fill thermowells with heat - transfer medium . E . Install direct - mounted thermometers in thermowells and adjust vertical and tilted positions . F . Install remote - mounted thermometer bulbs in thermowells and install cases on panels ; connect cases with tubing and support tubing to prevent kinks . Use minimum tubing length . G . Install duct - thermometer mounting brackets in walls of ducts . Attach to duct with screws . H . Install direct - mounted pressure gages in piping tees with pressure gage located on pipe at the most readable position . I . Install remote - mounted pressure gages on panel . J . Install valve and snubber in piping for each pressure gage for fluids ( except steam ). K . Install valve and syphon fitting in piping for each pressure gage for steam .

Location

Country

United States of America (USA)

State

MITN

Source

Source

MITN Purchasing Group

URL

More Details

Record type

Tender

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender