Runway reconstruction Project - Pierce County Airport - Thun Field
The scope, dates and status of this tender. A free account opens every field.
Source: Washington Purchasing Group
Schedule A – Base Bid – Runway 17 - 35 Reconstruction This project consists of full - depth reconstruction and widening of Runway 17 - 35 , removing and relocating Connector Taxiways A4 and B1 , constructing an asphalt mill and overlay of Connector Taxiways A1 , A2 , A3 and A5 , installing new subsurface edge drains
- Status
- Closed
- Sector
- Airport, Wind, Road
- Location
- Washington, United States of America
- Updated
- 3 Nov 2026
- Source
- Washington Purchasing Group
ConstructChat
Ask ConstructChat about Runway reconstruction Project - Pierce County Airport - Thun Field
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Schedule A – Base Bid – Runway 17 - 35 Reconstruction This project consists of full - depth reconstruction and widening of Runway 17 - 35 , removing and relocating Connector Taxiways A4 and B1 , constructing an asphalt mill and overlay of Connector Taxiways A1 , A2 , A3 and A5 , installing new subsurface edge drains , infiltration pipes , runway edge and threshold lights , lighted runway signing , Precision Approach Path Indicators , Runway End Identifier Lights , relocating the segmented circle and replacing the primary wind cone , and applying pavement markings to the reconstructed runway and connector taxiways . Schedule B – Bid Additive 1 – Obstruction Removal This work consists of clearing existing on - site tree and brush obstructions from the primary and transitional surfaces , and clearing and grubbing trees and brush from the Automated Weather Observation System critical area . Schedule C – Bid Additive 2 – Hangar Electrical Upgrades This work consists of replacing interior wiring , receptacles , interior lighting , and exterior lighting in Hangar A ( 16509 ), Hangar B ( 16513 ), Hangar C ( 16517 ), and Hangar E ( 16525 ). |
Location
Country | United States of America (USA) |
State | Washington |
Source
Source | Washington Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Airport, Wind, Road |
Article published date | 2026-05-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Airport tenders in United States of America
- Fuel Tank Inspection and Repair Services
- Tacoma Narrows Airport TIW Taxiway Relocation Improvements Project
- Cargo Apron Reconstruction and Replacement of Runway 927 with a Taxiway
- Fall Protection for Airport Jet Bridges
- Notice of Intent to Award a NonCompetitive Procurement for Siemens Logistics High Speed Diverters
- This is a Notification Only Continuing OnCall Architecture and Engineering Consulting Services W00486
- Electronic Gate Replacement
- INFORMATION TECHNOLOGY IT CONTINUING CONSULTING SERVICES
