Salinas River Parkway Trail Light System Replacement
Location: California, United States of America
Source: California Purchasing Group
The following scope of work outlines the anticipated tasks and deliverables associated with this project . It is intended to provide a general framework for the services required ; however , it is not intended to be all - inclusive . Proposers are encouraged to review the scope carefully and , where appropriate ,
- Status
- Closed
- Location
- California, United States of America
- Updated
- 3 Nov 2026
- Source
- California Purchasing Group
ConstructChat
Ask ConstructChat about Salinas River Parkway Trail Light System Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The following scope of work outlines the anticipated tasks and deliverables associated with this project . It is intended to provide a general framework for the services required ; however , it is not intended to be all - inclusive . Proposers are encouraged to review the scope carefully and , where appropriate , suggest additional tasks , methods , or enhancements that would support the successful completion of the project . Any such recommendations should be clearly identified and justified in the proposal . 3 . 1 Background Review and Field Investigation : At a minimum , the consultant shall review available project record drawings , City - provided photo documentation ( refer to attachment 2 ), and conduct a site visit to evaluate existing conditions . Deliverable : Existing Conditions Technical Memorandum documenting review of record drawings , site observations , field investigations , identification of deficiencies , and confirmation of project objectives and constraints . 3 . 2 Lighting Alternatives Development and Evaluation : The consultant shall develop lighting replacement alternatives and evaluate each option based on the following criteria : • Preliminary Cost Estimate which shall include engineering design , and construction . • Ease of installation • Potential disruption to trail users during construction • Long - term maintenance requirements and operational considerations • Resistance to vandalism and tampering • Light pollution impacts and compliance with dark - sky principles Deliverables : Lighting Alternatives Analysis evaluating vandal - resistant replacement options with respect to constructability , impacts to trail users , long - term maintenance , vandal / tamper resistance , and compliance with dark - sky principles . Recommended Alternative Summary identifying the selected lighting system and basis for recommendation , incorporating input from City staff and stakeholders . |
Location
Country | United States of America (USA) |
State | California |
Source
Source | California Purchasing Group |
URL |
More Details
Record type | Tender |
Article published date | 2026-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More infrastructure tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Veteran Transportation
- Countywide Vending Machine Services with Healthy Options
- Temporary Staffing Services Local and National
- NEW TIRES RETREADS AND TIRE SERVICES
- Youth Suicide Prevention Programming
