Sand Relocation - Holland State Park
The scope, dates and status of this tender. A free account opens every field.
Source: MITN Purchasing Group
Scope of Work for Snow Fence removal : Contractor to coordinate date and time of sand removal around fence with Park Manager / Supervisor . Contractor will consult with Park Manager / Supervisor on the method and demonstrate for final approval . Snow fence is to be removed by the contractor in a manner that
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Car parking, Commercial, Automotive
- Location
- MITN, United States of America
- Updated
- 3 Nov 2026
- Source
- MITN Purchasing Group
ConstructChat
Ask ConstructChat about Sand Relocation - Holland State Park
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Scope of Work for Snow Fence removal : Contractor to coordinate date and time of sand removal around fence with Park Manager / Supervisor . Contractor will consult with Park Manager / Supervisor on the method and demonstrate for final approval . Snow fence is to be removed by the contractor in a manner that avoids excessive damage to the snow fence . Removed fence shall be rolled up ( as tightly as possible ) and stacked neatly in the north parking lot for removal by park staff . Park will provide pallets in the north lot for fence posts to be neatly stacked by contractor for removal by park staff . Scope of Work for Sand Relocation : Sand relocation shall be executed throughout the Lake Michigan Unit of Holland State Park ; including the Entrance / Exit ( including the turn - around and fish dump pad ), Channel walkway ( including the outdoor classroom and benches ), Parking areas , Activity Courts , Concession Building , Beach Campground and Picnic Areas . Contractor shall start with the entrance area , Beach Campground and Channel Picnic Area . Miss Dig must be contacted by the contractor before any work is performed allowing adequate time for buried utilities to be marked . All equipment used must be well maintained and free from major leaks . Any large leaks must be addressed immediately . Cleanup costs , if necessary , will be the responsibility of the contractor . The exact dates for sand relocation will be determined by the Park Supervisor prior to the contractor starting sand relocation . Sand to be relocated to the main Beach or Channel Picnic area , as designated by Park Supervisor . Sand is to be removed from the parking lots , camping areas , roadways , under signs and fixed tables , fixed benches , buildings , play structures and walkways , ( hand work may be necessary ) down to bare - pavement level ; 10 ’ from pavement edges and placed on the Beach at a 5 % slope to Lake Michigan high water mark . |
Location
Country | United States of America (USA) |
State | MITN |
Source
Source | MITN Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Road, Water Supply and Storage, Car parking, Commercial, Automotive |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Road tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- NEW TIRES RETREADS AND TIRE SERVICES
- Professional Construction Engineering and Inspection CEI Services for the Williamson Boulevard Widening
- Lincoln Avenue Wascher to Killarney Preliminary Engineering Section 220065800PV
- KilleenFort Hood Regional Airport KFHRA Terminal Apron Rehabilitation Phase II
- IFB 947902022JM Screening 10 Asphalt Filter Stone 8 Granite Double Washed
- IFB 914202022AM Street Sweeper Parts and Brooms
- IFB 843402021AB Hay Alfalfa and Wheat Straw for Norfolk Zoo
