logo

SANITARY SEWER MANHOLE & CONDUIT INSTALLATION PROJECT

The scope, dates and status of this tender. A free account opens every field.

Source: Pennsylvania Purchasing Group

Tender
Closed

The Project includes the following Work : The Work generally consists of furnishing all labor , materials , equipment , and incidentals necessary for : Area 1 – Electrical Conduit and Power Installation • Install approximately 350 linear feet of two - inch ( 2 ”) Schedule 40 PVC conduit with associated wiring , including

Status
Closed
Sector
Waste Processing and Treatment, Metal, Power Generation (CCGT), Steel, Water Supply and Storage, Cement, Power Transmission
Location
Pennsylvania, United States of America
Updated
3 Nov 2026
Source
Pennsylvania Purchasing Group

ConstructChat

Ask ConstructChat about SANITARY SEWER MANHOLE & CONDUIT INSTALLATION PROJECT

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “SANITARY SEWER MANHOLE & CONDUIT INSTALLATION PROJECT” is a tender record in Taiyo, linked to the Waste Processing and Treatment sector. It is issued for works, goods, or services related to Pennsylvania, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The Project includes the following Work : The Work generally consists of furnishing all labor , materials , equipment , and incidentals necessary for : Area 1 – Electrical Conduit and Power Installation • Install approximately 350 linear feet of two - inch ( 2 ”) Schedule 40 PVC conduit with associated wiring , including all excavation and backfilling ; • Furnish and install ( 3 ) # 12 AWG copper THWN - 2 conductors to provide 120 - volt power to the ADS ECHO monitoring unit , including hot , neutral , and equipment grounding conductor . • Furnish and install utility - approved meter base and outdoor - rated breaker / disconnect enclosure to provide 120 - volt power to ADS ECHO monitoring unit . Coordinate with Met - Ed to determine whether mounting to an existing utility pole is permitted . If a separate support post is required , furnish and install a galvanized steel post set in concrete footing , including mounting hardware and required disconnects and receptacles as needed for ADS equipment ; • Provide electric power service and distribution , including coordination with Met - Ed ; • Core - drill manhole and extend conduit into manhole interior , including sealing in accordance with the Contract Documents . Area 2 – Manhole Modifications and Electrical Installation • Install approximately 70 linear feet of two - inch ( 2 ”) Schedule 40 PVC conduit with associated wiring , including all excavation and backfilling ; • Furnish and install ( 3 ) # 12 AWG copper THWN - 2 conductors to provide 120 - volt power to the ADS ECHO monitoring unit , including hot , neutral , and equipment grounding conductor . • Furnish and install utility - approved meter base and outdoor - rated breaker / disconnect enclosure to provide 120 - volt power to ADS ECHO monitoring unit . Coordinate with Met - Ed to determine whether mounting to an existing utility pole is permitted . If a separate support post is required , furnish and install a galvanized steel post set in concrete footing , including mounting hardware and required disconnects and receptacles as needed for ADS equipment ; • Provide electric power service and distribution , including coordination with Met - Ed ; • Core - drill manhole and extend conduit into manhole interior , including sealing in accordance with the Contract Documents . • Remove existing frame and cover ; furnish and install one ( 1 ) 18 - inch precast concrete riser section and new frame and cover to adjust manhole to proposed finished grade , complete in place . Area 3 – Sanitary Sewer Manhole Installation • The installation of one ( 1 ) five - foot - diameter sanitary sewer manhole complete with frame and cover to an approximate depth of eleven feet ; • Including excavation , bedding , structure installation , cut - in / tie - in to existing sanitary sewer , backfill , compaction , surface restoration , and required testing in accordance with the Contract Documents .

Location

Country

United States of America (USA)

State

Pennsylvania

Source

Source

Pennsylvania Purchasing Group

URL

More Details

Record type

Tender

Sector

Waste Processing and Treatment, Metal, Power Generation (CCGT), Steel, Water Supply and Storage, Cement, Power Transmission

Article published date

2026-05-09

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender