logo

SDG & E Safety Culture Comprehensive Assessment

Bids closed Mar 2026 · California · Last reported Feb 2026

Source: California Purchasing Group

Tender
Closed

The CPUC is seeking an Independent third - party Evaluator to conduct safety culture assessments . The selected Contractor will perform the SCA in accordance with the definitions , Framework , and processes adopted in D . 25 - 01 - 031 , following the IAEA methodology and approach , adapted for the regulated electric an

Status
Closed
Sector
Power Transmission, Power Generation (CCGT)
Location
California, United States of America
Updated
3 Nov 2026
Source
California Purchasing Group

ConstructChat

Ask ConstructChat about SDG & E Safety Culture Comprehensive Assessment

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “SDG & E Safety Culture Comprehensive Assessment” is a tender record in Taiyo, linked to the Power Transmission sector. It is issued for works, goods, or services related to California, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The CPUC is seeking an Independent third - party Evaluator to conduct safety culture assessments . The selected Contractor will perform the SCA in accordance with the definitions , Framework , and processes adopted in D . 25 - 01 - 031 , following the IAEA methodology and approach , adapted for the regulated electric and gas IOUs . Purpose of the Safety Culture Assessment The objectives of the SCA are to : 1 . Provide SDG & E leadership with thorough insights into the underlying basic assumptions and cultural drivers influencing employee behavior and outcomes , forming a foundation for improvement actions and lasting cultural change . 2 . Assess the effectiveness of the IOU ’ s safety culture improvement efforts between assessments to enhance future improvement approaches and strategies . 3 . Provide the CPUC and SDG & E with insights and recommendations to enhance tools and practices used to monitor safety culture and improvement between SCAs . C . Statement of Work Using the definitions adopted in D . 25 - 01 - 031 , the SCA must : A . Move beyond focusing on characteristics and attitudes to also address the ' underlying assumptions ' – the often unspoken , deeply held beliefs that dictate " the way we do things around here " 8 . B . Address all aspects of safety , as defined in D . 25 - 01 - 031 , with an emphasis on public safety , process and operational safety , and the prevention of low - probability highconsequence events . C . Cover all organizational levels and functions within SDG & E that are relevant to , or have the potential to impact , safety and risk ; from executive leadership to operational staff and external contractors . D . Include both gas and electric utility services , as applicable . The Contractor will perform a comprehensive SCA of SDG & E that includes the following components : 1 ) Multi - method comprehensive assessment : Conduct a systematic , multi - method assessment to provide a holistic snapshot of SDG & E ’ s safety culture . The assessment must employ multiple data collection methods , consisting of questionnaires / surveys , interviews , focus groups , site observations , and document reviews ; triangulating data across the different methods to : a . Identify common themes , differences , inconsistencies , and gaps in perceptions and behaviors ; b . Validate findings through cross - method comparisons ; and c . Develop a rich , evidence - based understanding of SDG & E ’ s safety culture . Tasks and Deliverables We anticipate this project will require up to twelve ( 12 ) months to be completed . All the tasks below should fit within this timeframe . The timelines herein are for initial planning purposes unless otherwise agreed to with the CPUC Contract Manager . Task 1 : Coordination and Monthly Progress Reports The Contractor will manage and execute the SCA in close collaboration with CPUC Contract Manager . The Contractor will develop the detailed workplans , schedules , and assessment activities for conducting the SCA . The CPUC Contract Manager will facilitate and assist with the coordination with SDG & E and its contractors . Key Responsibilities : 1 . Conduct Kick - off Meeting : Plan and conduct a kick - off meeting with CPUC and SDG & E to introduce the SCA purpose , approach , roles , and responsibilities . The session should align with the guiding principles established in Decision D . 25 - 01 - 031 . 2 . Participate in Ongoing Coordination : Participate in regularly scheduled coordination meetings with CPUC only , and CPUC and SDG & E jointly . These meetings will be used to coordinate assessment activities , track progress , and proactively identify and resolve potential challenges that may impede or delay effective implementation . Deliverables : 1 . Coordination Meetings : a . Conduct kick - off meeting (~ 2 Hours ) with CPUC and SDG & E jointly : This will serve as the first coordination meeting . b . Conduct two ( 2 ) meetings ( 1 hour ) per month with CPUC Contract Manager to track progress , identify issues and concerns and coordinate SCA activities . The frequency of meetings can be decreased based on the need of the project . c . Conduct two ( 2 ) coordination meetings per month ( 1 hour ) with CPUC and SDG & E jointly to track progress , address issues and concerns , and coordinate SCA activities . The frequency of meetings can be decreased based on the need of the project .

Location

Country

United States of America (USA)

State

California

Source

Source

California Purchasing Group

URL

More Details

Record type

Tender

Sector

Power Transmission, Power Generation (CCGT)

Article published date

2026-03-27

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender