Seattle Wellfield Modeling & Analysis ( 26 - 026 - S )
The scope, dates and status of this tender. A free account opens every field.
Source: Washington Purchasing Group
Seattle Public Utilities ( SPU ) is seeking a consultant to support groundwater modeling and technical analysis for waterright permitting of the Seattle Wellfield , as well as the design of required mitigation project . Since 1985 , SPU and the former Seattle Water Department have worked towards completing the Riv
- Status
- Closed
- Sector
- Airport, Water Supply and Storage
- Location
- Washington, United States of America
- Updated
- 3 Nov 2026
- Source
- Washington Purchasing Group
ConstructChat
Ask ConstructChat about Seattle Wellfield Modeling & Analysis ( 26 - 026 - S )
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Seattle Public Utilities ( SPU ) is seeking a consultant to support groundwater modeling and technical analysis for waterright permitting of the Seattle Wellfield , as well as the design of required mitigation project . Since 1985 , SPU and the former Seattle Water Department have worked towards completing the Riverton and Boulevard Park Wellfields , now collectively called the Seattle Wellfield , located north of SeaTac International Airport . SPU has operated the wellfield intermittently since the late 1990s under temporary permits , mostly recently in 2015 . The wells were originally pursued to provide peaking supply to meet high summer demands . The wells are also useful in other situations and times of the year : supplementing the surface supplies during drought conditions which helps ensure instream flows and maintaining supply to the southwest part of the SPU regional distribution system in the event of a transmission emergency . The Seattle Wellfield pumps water from an aquifer that is a known source of water for Miller Creek and potentially also a source for Des Moines Creek and the Green River . Under current Washington State case law , Seattle must mitigate for impacts to local water bodies . SPU pumped the wells for three months during a water shortage in 2015 and collected groundwater level data during and after that pumping . This data along with subsurface information published by U . S . Geological Survey was used to build a groundwater model intended to simulate the effect of pumping the wells on the aquifer , Miller Creek , Des Moines Creek , and the Green Rivers . |
Location
Country | United States of America (USA) |
State | Washington |
Source
Source | Washington Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Airport, Water Supply and Storage |
Article published date | 2026-05-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Airport tenders in United States of America
- Fuel Tank Inspection and Repair Services
- Tacoma Narrows Airport TIW Taxiway Relocation Improvements Project
- Cargo Apron Reconstruction and Replacement of Runway 927 with a Taxiway
- Fall Protection for Airport Jet Bridges
- Notice of Intent to Award a NonCompetitive Procurement for Siemens Logistics High Speed Diverters
- This is a Notification Only Continuing OnCall Architecture and Engineering Consulting Services W00486
- Electronic Gate Replacement
- INFORMATION TECHNOLOGY IT CONTINUING CONSULTING SERVICES
