Seaview WWTP Sludge Dryer Replacement Project - EOI
The scope, dates and status of this tender. A free account opens every field.
Source: New Zealand Government Electronic Tenders Service (GETS)
BackgroundThe Seaview WWTP began operations in 1962 with only a preliminary treatment (screening) process. The facility was later upgraded, and the current plant, utilizing a contact stabilization activated sludge treatment process, was commissioned in 2002.Over the years, the dryer has undergone significant modifications and upgrades to improve its reliability and maintainability. Despite these e
- Status
- Closed
- Sector
- Water Supply and Storage, Natural Gas, Government, Waste Processing and Treatment
- Location
- New Zealand
- Updated
- 3 Nov 2026
- Source
- New Zealand Government Electronic Tenders Service (GETS)
ConstructChat
Ask ConstructChat about Seaview WWTP Sludge Dryer Replacement Project - EOI
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | BackgroundThe Seaview WWTP began operations in 1962 with only a preliminary treatment (screening) process. The facility was later upgraded, and the current plant, utilizing a contact stabilization activated sludge treatment process, was commissioned in 2002.Over the years, the dryer has undergone significant modifications and upgrades to improve its reliability and maintainability. Despite these enhancements, the plant has required two major non-routine maintenance shutdowns in 2016 and 2018. Assessments of the mechanical equipment have revealed varying degrees of deterioration, with estimated remaining lifespans ranging from 0 to 20 years.Located at 17 Wareham Place, Seaview, Lower Hutt, the WWTP serves the catchment areas of both Hutt City Council (HCC) and Upper Hutt City Council (UHCC), supporting a population of approximately 160,000. According to the most recent "median growth" forecast by Sense Partners Ltd (2021), the catchment population is projected to increase by 40% by 2048 with the sludge dryer expected to reach capacity around 2030. However, this assumption is based on a 6 day per week operation, whereas current reliability issues and maintenance constraints limit operations to 5 days per week.Given the criticality of the sludge dryer, its capacity limitation and its dependency on natural gas as an energy source, the installation of a new sludge dryer has been determined as necessary. |
Location
Country | New Zealand |
Source
Source | New Zealand Government Electronic Tenders Service (GETS) |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Natural Gas, Government, Waste Processing and Treatment |
Article published date | 2026-10-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in New Zealand
- Ohineangaanga Stream Remediation Work / Erosion Repairs
- South Wairarapa DC Wastewater Upgrades - Professional Services
- HDC 1117 002 - WPDD - Maukoro Canal Stopbank Increase
- HDC 1117 002 - WPDD - Maukoro Canal Stopbank Increase
- HDC 1117 002 - WPDD - Maukoro Canal Stopbank Increase
- HDC 1117 002 - WPDD - Maukoro Canal Stopbank Increase
- Hilbre Avenue Reservoir - Gore
- Wastewater Investment Accelerator - Pre-RFP Information
