SERV26 * 318971 Flooring LBW
One of 10,000+ tenders Taiyo tracks in Alabama.
Source: Alabama Purchasing Group
1 . DEMOLITION : a . To remove and replace the carpet / LVT / VCT in areas shown and add LVT and 6 ” rubber base on floors of the L . B . Wallace Office Building as noted on floor plans attached . Contractor will have to coordinate with timeline , electricity as required to install carpet and base . b . Remove
- Status
- Closed
- Sector
- Residential, Power Generation (CCGT), Commercial
- Location
- Alabama, United States of America
- Updated
- 3 Nov 2026
- Source
- Alabama Purchasing Group
ConstructChat
Ask ConstructChat about SERV26 * 318971 Flooring LBW
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | 1 . DEMOLITION : a . To remove and replace the carpet / LVT / VCT in areas shown and add LVT and 6 ” rubber base on floors of the L . B . Wallace Office Building as noted on floor plans attached . Contractor will have to coordinate with timeline , electricity as required to install carpet and base . b . Remove and dispose of existing carpet and other flooring as noted , rubber base , and transition / reducer strips as required for new installation . 2 . INSTALLATION : a . Furnish and install the carpet tile / LVT and 6 ” rubber base . Base shall wrap around the corners . Contractor to use only manufacturer ’ s approved glue / adhesion . Color as selected by Owner . Location as shown on supplemental plan . b . Generally , the areas of work are occupied , however the worker and their personal items , computers , and printers will be removed during work . Adjacent spaces will be occupied and noise to be kept to a minimum . 3 . AREA OF WORK : a . L . B . Wallace Office Building , Floors 1 , 2 , 3 , 5 , 6 , 7 , 8 . Please see attached supplemental drawings for your use and clarity for work . Contractor may use a portion of the Basement for lay down space . b . All amount of material given in supplemental drawings are considered estimates only . Contractor to measure and verify actual quantities required to perform scope of work . |
Location
Country | United States of America (USA) |
State | Alabama |
Source
Source | Alabama Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Residential, Power Generation (CCGT), Commercial |
Article published date | 2026-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
