Service for recharging and Cell Balancing of BESS EPC 5001500
Sector: Water Supply and Storage • Location: California, United States of America
Source: California Purchasing Group
Perform battery cell health checks , balancing , and limited recharging on a non - energized Battery Energy Storage System ( BESS ) manufactured by EPC Energy , model E5001500 , rated at 500kW / 1573kWh , which is composed of two 20 - ft container units stored in a laydown area . Work includes : - Conducting visual inspection
- Status
- Closed
- Sector
- Water Supply and Storage, Energy Storage, Power Generation (CCGT)
- Location
- California, United States of America
- Updated
- 3 Nov 2026
- Source
- California Purchasing Group
ConstructChat
Ask ConstructChat about Service for recharging and Cell Balancing of BESS EPC 5001500
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Perform battery cell health checks , balancing , and limited recharging on a non - energized Battery Energy Storage System ( BESS ) manufactured by EPC Energy , model E5001500 , rated at 500kW / 1573kWh , which is composed of two 20 - ft container units stored in a laydown area . Work includes : - Conducting visual inspection of battery modules and trays . - Measuring cell voltage and temperature across modules . - Performing State of Health ( SoH ) assessments using manufacturer - approved methods . - Balancing cells using tools Battery Management System ( BMS ), Battery Management Unit ( BMU ) and Battery Control Unit ( BCU ) architecture . - Completing limited recharging if required . All tasks must follow industry - standard processes and adhere to LADWP instructions and guidance provided at the site to ensure safe handling and accurate diagnostics . Personnel performing the work must be trained and equipped with appropriate PPE and calibrated instruments . Deliverables include : - Complete data package ( voltage , temperature , SoH results ). - Balancing logs . Final report detailing findings , corrective actions , and recommendations for future maintenance . Pricing shall be based on two ( 2 ) technicians for 8 - hours for two ( 2 ) days ( on Monday through Friday , between 7 : 00 a . m . and 4 : 00 p . m .) to perform balancing of existing two E5001500 BESS EPC Cells at the job site . Includes all labor and expenses . |
Location
Country | United States of America (USA) |
State | California |
Source
Source | California Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Energy Storage, Power Generation (CCGT) |
Article published date | 2026-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
