Sewage Pump Replacement at NOC
One of 10,000+ tenders Taiyo tracks in United Kingdom.
Source: Find a Tender Service (UK)
The contract covers the design, supply, installation, testing, and commissioning of a replacement pit pumping system at the National Oceanography Centre, Southampton. The scope includes the removal and disposal of existing pumping infrastructure and the installation of two submersible Flyte pump units (approximately 3.1kW), together with associated mechanical components including stainless steel g
- Status
- Closed
- Sector
- Waste Processing and Treatment, Steel
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Find a Tender Service (UK)
ConstructChat
Ask ConstructChat about Sewage Pump Replacement at NOC
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The contract covers the design, supply, installation, testing, and commissioning of a replacement pit pumping system at the National Oceanography Centre, Southampton. The scope includes the removal and disposal of existing pumping infrastructure and the installation of two submersible Flyte pump units (approximately 3.1kW), together with associated mechanical components including stainless steel guide rails, brackets, lifting chains, and discharge connections. Pre-construction activities comprise site verification, dimensional checks, and preparation of technical designs and submittals. The contractor is responsible for procurement, quality assurance, and delivery of equipment. Installation works will be undertaken in accordance with CDM Regulations 2015 and include confined space procedures, isolation works, and system reinstatement. Testing and commissioning activities include operational testing, performance verification, and joint commissioning with the client. Electrical disconnection and reconnection will be undertaken by others unless otherwise agreed. The project is intended to improve system reliability, reduce maintenance requirements, and replace obsolete components within the existing infrastructure. |
Location
Country | United Kingdom (UK) |
Source
Source | Find a Tender Service (UK) |
URL |
More Details
Record type | Tender |
Sector | Waste Processing and Treatment, Steel |
Article published date | 2026-09-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Waste Processing and Treatment tenders in United Kingdom
- ITT 09/2025 - HRC Sites Collection, Recycling, Disposal of Waste Streams Lot 3 Carboard Down
- Weyside Urban Village - Phase 4 Enabling Works and Infrastructure
- Geographic Information Systems (GIS)
- Waste Management and Recycling Framework
- Prison Waste Management Instructors Training
- Sewage treatment plants routine service and maintenance services
- Pool Water Recovery Systems Across Three Sports Centres
- Beckenham Housing Scheme - Thames Water
