Sharnberry MWTS - Power Connection - Phase 2 Non-Contestable Works
The scope, dates and status of this tender. A free account opens every field.
Source: Open Contracting Data Standard (OCDS)
The Water and Abandoned Metal Mines Programme (WAMM) is the primary delivery mechanism to achieve the statutory Environment Act target to halve the length of rivers polluted by harmful metals from abandoned metal mines by 2038. WAMM is being delivered by a partnership between the Mining Remediation Authority, the Environment Agency and Defra. The former Sharnberry mines are located in County Dur
- Status
- Closed
- Sector
- Water Supply and Storage, Metal, Power Generation (CCGT)
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Open Contracting Data Standard (OCDS)
ConstructChat
Ask ConstructChat about Sharnberry MWTS - Power Connection - Phase 2 Non-Contestable Works
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Water and Abandoned Metal Mines Programme (WAMM) is the primary delivery mechanism to achieve the statutory Environment Act target to halve the length of rivers polluted by harmful metals from abandoned metal mines by 2038. WAMM is being delivered by a partnership between the Mining Remediation Authority, the Environment Agency and Defra. The former Sharnberry mines are located in County Durham at the far eastern edge of the North Pennines Orefield, in the Pennines Moors. The mines pollute rivers in the Wear catchment, specifically the Euden Beck and downstream Bedburn Beck. The Environment Agency carried out a detailed monitoring programme to measure the metal concentrations and river flows at various points across the catchment. This monitoring indicated that the Sharnberry adit is the most significant source of zinc and cadmium pollution and also contributes to lead pollution. The Environment Agency have advised that a Mine Water Treatment Scheme (MWTS) is required that will require a permanent power connection. In February 2025, it was agreed to progress with Phase 1 of the grid connection, which is from Eggleston Crest to the boundary of the Eggleston Estate access track. This contract is for non-contestable works of the phase 2 grid extension, which is for Northern Powergrid to: - Upgrade the existing two-conductor system to Three-Phase, which involves rebuilding the line. - Carrying out 1x HV closing joint - Undertaking all Senior Authorised Person work associated with all connections to the Distribution System |
Location
Country | United Kingdom (UK) |
Source
Source | Open Contracting Data Standard (OCDS) |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Metal, Power Generation (CCGT) |
Article published date | 2026-04-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United Kingdom
- District Heating Network Performance, Operational Monitoring and Planned Maintenance Services
- Swiftwater and Flood Boat Rescue Operator Training
- Sewer Mapping
- Technology Services Partner Framework (TSPF)
- Technology Services Partner Framework (TSPF)
- Provision and installation of burial vaults
- Diagnostic and Capital Equipment and Related Accessories and Services
- Wheal Jane - Reaction Chamber Mixing Tanks VSDs
