logo

Sharnberry MWTS - Power Connection - Phase 2 Non-Contestable Works

The scope, dates and status of this tender. A free account opens every field.

Source: Open Contracting Data Standard (OCDS)

Tender
Complete

The Water and Abandoned Metal Mines Programme (WAMM) is the primary delivery mechanism to achieve the statutory Environment Act target to halve the length of rivers polluted by harmful metals from abandoned metal mines by 2038. WAMM is being delivered by a partnership between the Mining Remediation Authority, the Environment Agency and Defra. The former Sharnberry mines are located in County Dur

Status
Closed
Sector
Water Supply and Storage, Metal, Power Generation (CCGT)
Location
United Kingdom
Updated
3 Nov 2026
Source
Open Contracting Data Standard (OCDS)

ConstructChat

Ask ConstructChat about Sharnberry MWTS - Power Connection - Phase 2 Non-Contestable Works

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Sharnberry MWTS - Power Connection - Phase 2 Non-Contestable Works” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to United Kingdom.

Participants

Not available for this record.

Status

Original status

complete

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The Water and Abandoned Metal Mines Programme (WAMM) is the primary delivery mechanism to achieve the statutory Environment Act target to halve the length of rivers polluted by harmful metals from abandoned metal mines by 2038. WAMM is being delivered by a partnership between the Mining Remediation Authority, the Environment Agency and Defra. The former Sharnberry mines are located in County Durham at the far eastern edge of the North Pennines Orefield, in the Pennines Moors. The mines pollute rivers in the Wear catchment, specifically the Euden Beck and downstream Bedburn Beck. The Environment Agency carried out a detailed monitoring programme to measure the metal concentrations and river flows at various points across the catchment. This monitoring indicated that the Sharnberry adit is the most significant source of zinc and cadmium pollution and also contributes to lead pollution. The Environment Agency have advised that a Mine Water Treatment Scheme (MWTS) is required that will require a permanent power connection. In February 2025, it was agreed to progress with Phase 1 of the grid connection, which is from Eggleston Crest to the boundary of the Eggleston Estate access track. This contract is for non-contestable works of the phase 2 grid extension, which is for Northern Powergrid to: - Upgrade the existing two-conductor system to Three-Phase, which involves rebuilding the line. - Carrying out 1x HV closing joint - Undertaking all Senior Authorised Person work associated with all connections to the Distribution System

Location

Country

United Kingdom (UK)

Source

Source

Open Contracting Data Standard (OCDS)

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Metal, Power Generation (CCGT)

Article published date

2026-04-02

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender