Shaw Afb Pointsett Lmr Tower
The scope, dates and status of this tender. A free account opens every field.
Source: SAM.gov
This is a construction requirement to build a new 120ft tower at the Poinsett Range and move the existing equipment to the new tower in accordance with the Statement of Objectives.This requirement is for a construction contract to replace an existing structure and is expected to increase coverage to the range by reducing dead spots. This project will include a new tower, antennas, antenna cables,
- Status
- Closed
- Sector
- Aerospace & Defense, Commercial, Bridge, Road, Residential, Government
- Location
- United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Shaw Afb Pointsett Lmr Tower
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | presolicitation |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | This is a construction requirement to build a new 120ft tower at the Poinsett Range and move the existing equipment to the new tower in accordance with the Statement of Objectives.This requirement is for a construction contract to replace an existing structure and is expected to increase coverage to the range by reducing dead spots. This project will include a new tower, antennas, antenna cables, ice bridge between the shelter and antenna, and ground ring tied into the shelter ground.The Contractor shall be responsible for planning, designing, constructing, and managing all activities necessary to achieve the objectives of the attached Statement of Objectives (SOO). The Government will not direct or control the Contractor?s construction means and methods but will evaluate performance based on compliance with the objectives and acceptance criteria defined herein.The purpose of the attached SOO is to define the objectives, performance outcomes, and constraints for the construction effort while allowing Offerors the flexibility to propose effective and innovative design and construction solutions. The Contractor shall develop the detailed technical approach and supporting documentation necessary to meet the objectives of the SOO. Please refer to attached SOO and all attachments for details. |
Original sector | Construction |
Location
Country | United States of America (USA) |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Aerospace & Defense, Commercial, Bridge, Road, Residential, Government |
Article published date | 2026-03-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
