Sheridan Hills SRTS 2026 Sidewalks
Sector: Waste Processing and Treatment • Location: Minnesota, United States of America
Source: Minnesota Purchasing Group
Remove Bituminous Pavement 848 SY Common Excavation 760 CY Aggregate Base Class 5 440 CY 12 ” RC Pipe Sewer 322 LF Drainage Structure ( 2X3 and 72 ”) 10 EACH Concrete Walk ( 4 ” and 6 ”) 8882 SF Concrete Curb and Gutter ( B618 ) 767 LF Crosswalk Pavement Markings 120 SF Relocate Hydrant 2 EACH
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Cement, Road
- Location
- Minnesota, United States of America
- Updated
- 3 Nov 2026
- Source
- Minnesota Purchasing Group
ConstructChat
Ask ConstructChat about Sheridan Hills SRTS 2026 Sidewalks
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Remove Bituminous Pavement 848 SY Common Excavation 760 CY Aggregate Base Class 5 440 CY 12 ” RC Pipe Sewer 322 LF Drainage Structure ( 2X3 and 72 ”) 10 EACH Concrete Walk ( 4 ” and 6 ”) 8882 SF Concrete Curb and Gutter ( B618 ) 767 LF Crosswalk Pavement Markings 120 SF Relocate Hydrant 2 EACH |
Location
Country | United States of America (USA) |
State | Minnesota |
Source
Source | Minnesota Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Waste Processing and Treatment, Water Supply and Storage, Cement, Road |
Article published date | 2026-05-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Waste Processing and Treatment tenders in United States of America
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Annual Construction Contract For Utility Replacement 2022A
- FY23 Sewer Rehabilitation
- Fire Station 32 ADA Restroom Improvements
- Foothills Trail East Puyallup McMillin Trailhead Improvements
- Pipeline Trail Phase 1 Project
