logo

Sheriff ' s Office and Jail Exterior Stair Replacement SKA Project 230037 . 1

One of 10,000+ tenders Taiyo tracks in North Carolina.

Source: North Carolina Purchasing Group

Tender
Closed

The work described in the Contract Documents includes the furnishing of all labor , materials , equipment , and services necessary and incidental to complete the following work : 1 . Protection : Provide temporary barricades , fences , and other forms of protection to protect the Owner ' s personnel , public , and tenants

Status
Closed
Sector
Metal, Steel, Manufacturing (Industrial), Commercial, Cement, Residential
Location
North Carolina, United States of America
Updated
3 Nov 2026
Source
North Carolina Purchasing Group

ConstructChat

Ask ConstructChat about Sheriff ' s Office and Jail Exterior Stair Replacement SKA Project 230037 . 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Sheriff ' s Office and Jail Exterior Stair Replacement SKA Project 230037 . 1” is a tender record in Taiyo, linked to the Metal sector. It is issued for works, goods, or services related to North Carolina, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The work described in the Contract Documents includes the furnishing of all labor , materials , equipment , and services necessary and incidental to complete the following work : 1 . Protection : Provide temporary barricades , fences , and other forms of protection to protect the Owner ' s personnel , public , and tenants from injury due to the work . Provide protective measures as required to provide free and safe passage of the Owner ' s personnel and tenants to the occupied portions of building . 2 . Selective Demolition : Selectively demolish and legally dispose of the existing concrete stairs , metal railings , and other stair components , as indicated in the Contract Documents . 3 . Undercut and Backfill : Undercut the existing soils to the depth indicated in the Contract Documents and legally dispose offsite . Install geotextile and new compacted backfill . Coordinate activities with the Engineer to allow for the specified third - party inspections and testing . 4 . Concrete stairs : Install and cure new reinforced concrete stairs . Coordinate activities with the Engineer to allow for specified third - party party inspections and testing . 5 . Metal Railings : a . The Contractor will design railing system and anchorage of railing to substrate to withstand structural loads required by Code . Prepare and submit for the Owner and Engineer approval shop drawings of proposed system . Final approved Drawings will be sealed by the Contractor ’ s engineer , licensed in the State of North Carolina . Do not proceed with fabrication until receiving written approval . b . Furnish , fabricate , deliver , and install new , approved aluminum railing and support base anchorage system . 6 . Joint sealants : Perform surface preparation and install new joint sealants

Location

Country

United States of America (USA)

State

North Carolina

Source

Source

North Carolina Purchasing Group

URL

More Details

Record type

Tender

Sector

Metal, Steel, Manufacturing (Industrial), Commercial, Cement, Residential

Article published date

2026-05-08

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender