Sheriff ' s Office Pole Barn Construction
Sector: Road • Location: MITN, United States of America
Source: MITN Purchasing Group
The Contractor shall : 1 . Clear and grub an approximate 250 ' x 160 ' area , including removal of trees , brush and stumps . All debris shall be properly disposed of off - site . 2 . Strip and stockpile topsoil for redistribution around the building site . 3 . Import sand and raise the building pad approximately
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Metal, Power Generation (CCGT), Commercial, Residential
- Location
- MITN, United States of America
- Updated
- 3 Nov 2026
- Source
- MITN Purchasing Group
ConstructChat
Ask ConstructChat about Sheriff ' s Office Pole Barn Construction
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Contractor shall : 1 . Clear and grub an approximate 250 ' x 160 ' area , including removal of trees , brush and stumps . All debris shall be properly disposed of off - site . 2 . Strip and stockpile topsoil for redistribution around the building site . 3 . Import sand and raise the building pad approximately four ( 4 ) feet . Spread and compact to a minimum of 95 % compaction using appropriate compaction equipment . 4 . Establish finished floor elevation approximately eight ( 8 ) inches above adjacent roadway elevation . 5 . Install six ( 6 ) inches of MDOT 21AA gravel over the building pad . Spread and compact to 95 % compaction . 2 . Utility Tap Connections Water 1 . Tap into existing water main . 2 . Install copper valve , curb stop , and shutoff . 3 . Excavate , install , and backfill approximately 100 linear feet of 1 " Type K copper water service line . 4 . Compact trench backfill to 100 % compaction . Sanitary Sewer 1 . Tap into existing 6 " SDR35 sewer line . 2 . Saw cut and remove asphalt as required . 3 . Install 6 " SDR35 pipe with bell and gasket . 4 . Install cleanout on the south side of the road . 5 . Install approximately 150 linear feet of sewer piping . 6 . Backfill and compact in lifts . 7 . Final 12 inches to consist of 21AA road gravel , compacted and prepared for asphalt restoration . |
Location
Country | United States of America (USA) |
State | MITN |
Source
Source | MITN Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Road, Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Metal, Power Generation (CCGT), Commercial, Residential |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Road tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- NEW TIRES RETREADS AND TIRE SERVICES
- Professional Construction Engineering and Inspection CEI Services for the Williamson Boulevard Widening
- Lincoln Avenue Wascher to Killarney Preliminary Engineering Section 220065800PV
- KilleenFort Hood Regional Airport KFHRA Terminal Apron Rehabilitation Phase II
- IFB 947902022JM Screening 10 Asphalt Filter Stone 8 Granite Double Washed
- IFB 914202022AM Street Sweeper Parts and Brooms
- IFB 843402021AB Hay Alfalfa and Wheat Straw for Norfolk Zoo
