Shingle Roof
Sector: Water Supply and Storage • Location: Arkansas, United States of America
Source: Arkansas Purchasing Group
The Contractor shall furnish all labor , materials , tools , equipment , supervision , transportation , and incidentals necessary to complete the entire Scope of Work that follows : 1 . Prospective contractor shall perform the removal of existing Standing seam . And the removal of all debris from project site . 2 . Prospe
- Status
- Closed
- Sector
- Water Supply and Storage, Forest Products and Packaging, Wind, Telecommunications, Commercial, Hotel
- Location
- Arkansas, United States of America
- Updated
- 3 Nov 2026
- Source
- Arkansas Purchasing Group
ConstructChat
Ask ConstructChat about Shingle Roof
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Contractor shall furnish all labor , materials , tools , equipment , supervision , transportation , and incidentals necessary to complete the entire Scope of Work that follows : 1 . Prospective contractor shall perform the removal of existing Standing seam . And the removal of all debris from project site . 2 . Prospective contractor shall install 2 . 5 ” Hunter H - Shield NB ridge roof insulation composite panel composed of a closed cell polyisocyanurate foam core manufactured online to a fiber reinforced 5 / 8 ” facer or equivalent . And must meet manufacturers ’ fastening requirements . 3 . Prospective contractor shall note that all Eve and Rake fascia must be wider to compensate for the added thickness of the Polyiso . 4 . Prospective contractor shall be responsible for all safety barriers like orange construction fence to keep bystanders out of work areas and at a safe distance or equivalent . 5 . Prospective contractor shall be responsible for any permits that may be required . 6 . Prospective contractor shall furnish all materials , tools and labor , equipment to install new drip edge and StormTread synthetic roofing underlayment or equivalent and a ( class 3 impact ) 60 - mph wind architectural shingles Approx . ( 3 , 588 sq . ft .) of roof area . And Approx . ( 286 ’ lin . Ft . drip edge ) and Approx . ( 100 ’ lin . Ft . vent ridge ) 7 . The color of shingles shall best match existing ( Weatherwood ) and other roofs if close to the one that ’ s being replaced . 8 . Prospective contractor shall install a premium starter strip around the eaves and rakes to help prevent wind uplift . 9 . Prospective contractor shall nail the shingles with a minimum one inch in length and a minimum four nails per shingle . 10 . Prospective contractor shall install the entire roof system to meet manufacturers ’ specifications and any state , county , and city building codes . 11 . Prospective contractor shall install new roof vent boots / jacks . Roof vent boots & flashing , and chimney flashing to be painted color to best match roof . 12 . Prospective contractor shall remove turbine vents if applicable and patch decking . 13 . Prospective contractor shall be responsible for re - sealing all roof penetrations . 14 . Prospective contractor shall be responsible for replacing any damage , rotten decking or fascia and drip edge lumber to match existing and the re - nailing of any lose decking or fascia . 15 . Any fascia , drip edge lumber removed or replaced contractor will caulk all joints and fill all nail holes and paint with two coats of BEHR Premium Plus Ultra paint and primer in one semi - gloss or equivalent . 16 . If any paint is needed Travis McClure will be the one to give you the color codes to use . 17 . Prospective contractor shall also be responsible to cover and protect anything that overspray or paint drips can possibly get on . 18 . Prospective contractor shall also use an insecticide paint additive on final coat . 19 . Prospective contractor shall work during normal business hours . 20 . Prospective contractor shall be responsible for all materials delivered and protection of during construction . 21 . Prospective contractor shall be responsible for the daily clean - up and the removal of all demolition / construction debris including nails and metals offsite . 22 . Prospective contractor shall be responsible for removing cable or satellite dishes and no dishes shall be attached to new shingle roof . 23 . Prospective contractor shall install ice and water shield in all valleys and roof transitions . 24 . Photographs may be requested by Travis McClure during installation . 25 . Prospective contractor shall be responsible for protection of building from elements during construction and the precautions to be taken to prevent damage to landscaping . 26 . Prospective contractor shall remove and reinstall and protect all gutters and down spouts , if applicable . 27 . Park is not responsible for equipment and materials left on project site |
Location
Country | United States of America (USA) |
State | Arkansas |
Source
Source | Arkansas Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Forest Products and Packaging, Wind, Telecommunications, Commercial, Hotel |
Article published date | 2026-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
