Silver Lake Campground Shower Head Replacements
Closed · MITN · Last reported Feb 2026
Source: MITN Purchasing Group
SCOPE OF WORK : The Work to be completed under this contract includes furnishing all labor , materials , and equipment to : Remove 6 existing Symmons Hydapipe Surface Mounted Shower Systems ( 32 ” overall height / 6 ” width ) and replace with 6 new “ replacement - in - kind ” shower assemblies with fixed showerheads . New
- Status
- Closed
- Sector
- Water Supply and Storage, Metal, Steel
- Location
- MITN, United States of America
- Updated
- 3 Nov 2026
- Source
- MITN Purchasing Group
ConstructChat
Ask ConstructChat about Silver Lake Campground Shower Head Replacements
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | SCOPE OF WORK : The Work to be completed under this contract includes furnishing all labor , materials , and equipment to : Remove 6 existing Symmons Hydapipe Surface Mounted Shower Systems ( 32 ” overall height / 6 ” width ) and replace with 6 new “ replacement - in - kind ” shower assemblies with fixed showerheads . New fixtures must be Hydapipe or comparable alternate product . Contractor to replace any piping , valves , and / or shutoffs as necessary . Any gate valves that need to be replaced must be replaced with ball valves . All lines to be flushed before installation to remove any debris and verify proper flow of both hot and cold water . Water availability is not possible until freezing weather temperatures have substantially subsided . Once water supply is turned on in the spring , Contract must check operation to locate and repair any / all leaks . DNR is responsible for plan review waiver application . Contractor is responsible for all permits and inspections . New fixtures must be : High - gloss stainless steel construction Include soap tray Ada compliant Institutional quality 2 . 6 GPM flow rate Temperature mixing valve All metal internal parts Approved Alternate Products : Zurn Zoro A7500 # G4053710 Zurn Aqua - Panel Z7500 52JJ10 Z7500 - I2 - 1 . 25 Speakman Sentinel Mark II bci1376563 |
Location
Country | United States of America (USA) |
State | MITN |
Source
Source | MITN Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Metal, Steel |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
