Sinclair Canyon Retaining Wall, Bridge & Rock Tunnel Rehabilitation, Kootenay National Park
Active · Canada · Last reported Apr 2026
Source: Canada Buy and Sell
REQUIREMENT
Parks Canada Agency requires a Contractor to provide Water Channel Diversion, Micropiling, Rock Anchoring, Shotcrete Application, Stone Masonry, and Structural Reinforced Concrete Demolition and Rehabilitation within Sinclair Canyon, along Highway 93S in Kootenay National Park.
The project consists of three work packages in close proximity within Sinclair Canyon, along Highway 93
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Bridge, Government, Cement, Tunnel, Car parking, Automotive
- Location
- Canada
- Updated
- 3 Nov 2026
- Source
- Canada Buy and Sell
ConstructChat
Ask ConstructChat about Sinclair Canyon Retaining Wall, Bridge & Rock Tunnel Rehabilitation, Kootenay National Park
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | REQUIREMENT Parks Canada Agency requires a Contractor to provide Water Channel Diversion, Micropiling, Rock Anchoring, Shotcrete Application, Stone Masonry, and Structural Reinforced Concrete Demolition and Rehabilitation within Sinclair Canyon, along Highway 93S in Kootenay National Park. The project consists of three work packages in close proximity within Sinclair Canyon, along Highway 93S in Kootenay National Park. The three work packages are: 1. Strengthening of an existing 72m long by 4-5m high (exposed face) bin wall. Associated work includes the re-instatement of the road and associated street furniture impacted during the construction of the retaining wall. Major work items include but not limited to: micropiling, rock anchoring, cast-in-place concrete as well as shotcrete. 2. Rehabilitation of Sinclair Canyon Bridge includes but not limited to: structural concrete repairs, removal/replacement of reinforced cast in place concrete sidewalk/overhang as well as stone masonry dismantle/rebuild. 3. Rehabilitation of Sinclair Creek Rock Tunnel, major work includes but not limited to: check scaling, rock bolting, shotcreting, as well as cast in place concrete. TWO STAGE SELECTION PROCESS This posting is the Stage Two of a two-stage solicitation process: the first stage was to evaluate the qualifications of all interested suppliers. The second stage (Stage Two) is to invite the qualified suppliers to provide further qualifications and a financial bid on the project based on the specifications and drawings. Only qualified suppliers have been invited to bid. Potential and interested sub-contractors are invited to add their company’s name under the section “Partner with another business”. |
Budget |
Location
Country | Canada |
Source
Source | Canada Buy and Sell |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Road, Bridge, Government, Cement, Tunnel, Car parking, Automotive |
Article published date | 2026-04-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in Canada
- Acquisition of a wall valve and a flapper for the sewer - Water service (Industrial equipment)
- Autonomous analysis equipment for the Legionella pneumophila pathogen in industrial waters (Scientific instruments)
- Supply and installation of residential water meters (Scientific instruments)
- 2022-3035 - Grading
- 2023-3048 - TREE REMOVALS AND CLEARNGTender InstructionsContract Dates
- EW038-270871 - ITQ Construction of Storm Sewer Drain Pipe and Appurtenances at Northern Forestry Centre, Edmonton
- 2026 FOG COAT
- Old Exhibition Grounds Community Garden
