Site Waste Clearance Bolton House Road
Sector: Automotive • Location: United Kingdom
Source: Open Contracting Data Standard (OCDS)
Wigan Council is seeking a suitably qualified contractor to clear waste illegally deposited on Diggle Flash Nature Reserve adjacent to Bolton House Road, Bickershaw, Wigan WN2 4AB. Wigan Council has committed to remove the waste that has been deposited on Diggle Flash (a nature reserve) adjoining the rear (or east of the Bolton House Road site). Wigan Council expects the contractor to remove an es
- Status
- Closed
- Sector
- Automotive, Road
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Open Contracting Data Standard (OCDS)
ConstructChat
Ask ConstructChat about Site Waste Clearance Bolton House Road
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Wigan Council is seeking a suitably qualified contractor to clear waste illegally deposited on Diggle Flash Nature Reserve adjacent to Bolton House Road, Bickershaw, Wigan WN2 4AB. Wigan Council has committed to remove the waste that has been deposited on Diggle Flash (a nature reserve) adjoining the rear (or east of the Bolton House Road site). Wigan Council expects the contractor to remove an estimated 3,243 tonnes. The contractor will be responsible for all aspects of management, access, construction, security, health and safety, haulage/treatment and restoration. The Bolton House Road site is subject to a closure order (granted 18th July 2025). Access to the site is strictly controlled and contractors appointed by Wigan Council are permitted to work on the site with permission of the landowner. The contractor is expected to access the site via the Smith’s Lane nature reserve-Diggle Flash footpath, which will involve establishing an access route and clearing site vegetation, prior to excavating and loading the waste onto haulage vehicles for transfer to permitted disposal facilities. The project will therefore involve the following steps: 1) Phase 1 – Site Preparation and Access a. Health and Safety b. Environmental Protection c. Site Security and Welfare 2) Phase 2 – Arboriculture works and ground protection a. Vegetation removal b. Temporary road surface 3) Phase 3 - Excavation, loading and waste treatment a. Excavation and loading b. Haulage and waste disposal 4) Phase 4 – Safe Site Reprofiling and Public Safety. |
Location
Country | United Kingdom (UK) |
Source
Source | Open Contracting Data Standard (OCDS) |
URL |
More Details
Record type | Tender |
Sector | Automotive, Road |
Article published date | 2026-04-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Automotive tenders in United Kingdom
- Spitfire Way works contract
- Car Park Management & Infrastructure
- COV - Stoke Park School - Enabling Works
- Vehicle Lease, Fleet Management and Salary Sacrifice Car Schemes
- Garage minor works and maintenance
- Vehicle Accident Repair for Cleveland Police, Northumbria Police and Durham Constabulary
- Pay and Display Machine Maintenance and Associated Back-office System, Hardware Upgrades, and PSP Service
- Provision of a Design and Build JCT 2024 contractor for the development of Nye Bevan Estate garages
