Site Wide Infrastructure - Next Generation Infrastructure Programme
Sector: Power Generation (CCGT) • Location: United Kingdom
Source: Open Contracting Data Standard (OCDS)
This package of works forms part of the Next Generation Infrastructure (NGI) Programme, a funded development programme looking to develop the facilities across Norwich Research Park to transform the existing capabilities of John Innes Centre (JIC) and The Sainsbury Laboratory (TSL), both internally recognised centres of excellence in plant and microbial science. NGI will address the deterioration
- Status
- Closed
- Sector
- Power Generation (CCGT), Telecommunications, Commercial, Water Supply and Storage, Road
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Open Contracting Data Standard (OCDS)
ConstructChat
Ask ConstructChat about Site Wide Infrastructure - Next Generation Infrastructure Programme
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | This package of works forms part of the Next Generation Infrastructure (NGI) Programme, a funded development programme looking to develop the facilities across Norwich Research Park to transform the existing capabilities of John Innes Centre (JIC) and The Sainsbury Laboratory (TSL), both internally recognised centres of excellence in plant and microbial science. NGI will address the deterioration of infrastructure at JIC and TSL to create a world-class facility that will engage with its surroundings, is outward looking and promotes collaboration and innovation to supercharge JIC and TSL's ability to translate scientific knowledge into practical solutions. This package of works comprises of the demolition of existing buildings, provision of upgraded internal access roads and below ground infrastructure works including (but not limited to) new and relocated communications and electricity cabling, upgraded mains water infrastructure, new surface water drainage and new district heating pipework to enable site wide development proposals at John Innes Centre and NGI (the Works). The Works will be carried out on a live scientific research site and in close proximity to ongoing operations and adjacent healthcare facilities. The Works have been designed by the NGI client-side design team who were procured through a competitive tender process in 2018/2019. The Works are governed by the JCT Standard Building Contract (Without Quantities) 2016 with client amendments. |
Location
Country | United Kingdom (UK) |
Source
Source | Open Contracting Data Standard (OCDS) |
URL |
More Details
Record type | Tender |
Sector | Power Generation (CCGT), Telecommunications, Commercial, Water Supply and Storage, Road |
Article published date | 2026-10-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Power Generation (CCGT) tenders in United Kingdom
- Kettlethorpe High School ~ Cleaning Tender
- Civils, Buildings, OHL and UGC Framework – Multi Site
- ALL WALES SPINAL IMPLANTS & CONSUMABLES
- Purchase of CBtect Portable Circuit Breaker Monitoring
- Pay and Display Machine Maintenance and Associated Back-office System, Hardware Upgrades, and PSP Service
- NEPO303 Meter Operator Services
- Provision of Northside School Fire Alarm Renewal
- 357 Fleet Refurbishment and Systems Upgrade
