logo

Skid Units for OFD Brush Trucks

One of 5,966 tenders Taiyo tracks in Nebraska.

Source: Nebraska Purchasing Group

Tender
Closed

4 EA Skid Units ( includes installation ); Specifications include , but are not limited to : The skid units will be designed to fit a 2026 Ford F - 350 regular cab , SRW , 8ft . Box , 4x4 , 7 . 3 gas motor pickup with tailgate . The skid unit must fit inside the truck box that will have a headache rack an

Status
Closed
Sector
Water Supply and Storage, Oil and Gas, Metal, Steel, Residential
Location
Nebraska, United States of America
Updated
3 Nov 2026
Source
Nebraska Purchasing Group

ConstructChat

Ask ConstructChat about Skid Units for OFD Brush Trucks

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Skid Units for OFD Brush Trucks” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to Nebraska, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

4 EA Skid Units ( includes installation ); Specifications include , but are not limited to : The skid units will be designed to fit a 2026 Ford F - 350 regular cab , SRW , 8ft . Box , 4x4 , 7 . 3 gas motor pickup with tailgate . The skid unit must fit inside the truck box that will have a headache rack and Weatherguard Hi - Side tool boxes mounted along both sides of the bed . The bid will be for four complete skid units . Skid units will be installed by the winning bidder . Section 1 : Pump CET 20HP - MR Performance : The pump / engine shall be capable of meeting or exceeding the NFPA 1906 performance rating of 50GPM @ 150PSI . Typical pump performance from 5 - foot draft at sea level shall be : 60GPM @ 200PSI , 125GPM @ 150PSI , 195GPM @ 100PSI , 240GPM @ 50PSI . Pump : The pump body shall be made of a high resistance aluminum alloy castings coupled together with stainless steel fasteners . The pump impeller and replaceable clearance ring shall be made of bronze material to inhibit galvanic corrosion . The pump shaft seal shall be an automatically adjusted , maintenance free , mechanical type . There shall be a drain petcock valve provided at the bottom of the pump body . Priming : The pump shall be equipped with an exhaust venturi primer system . The primer shall be capable of priming at a minimum of 13 feet lift . The primer shall be actuated by a single quarter turn valve located off the engine exhaust . Suction / Discharge : The suction port shall be 2 . 5 ” male pipe thread . The discharge port shall be 1 . 5 ” with a 1 . 5 ” female NPT flange . The flange shall be attached by stainless - steel fasteners . Engine : The engine shall be a 4 - cycle gasoline Honda GX630 series , V - twin , air cooled design . The engine shall be rated at 20 . 8hp @ 3 , 600rpm with a torque of 35 . 6lb - ft @ 2 , 500rpm . A 12 - volt electric system shall be provided with an electric starter and a 17 - amp alternator . The engine shall be equipped with a residential muffler with USDA approved spark arrestor . Mounting Platform : The pump / engine shall be mounted onto a steel base plate that is powder coated to prevent rust and corrosion . The base plate shall be secured to the skid frame using four ( 4 ) rubber isolation feet and stainless - steel fasteners . Instrumentation : The pump shall be supplied with a control panel . This panel shall include a keyed ignition switch , hour meter , low oil indicator , throttle lever , choke control and 2 . 5 ” liquid filled discharge gauge . The control panel shall also include a pump panel light activated by the keyed ignition switch for operations during low light conditions . Section 2 : Tank ; UPF DEFENDER 2CE ; Capacity : The tank shall be able to contain 250 - gallons of water . No foam storage or system . Top of foam tank to be an “ open ” design and used for storage . Material / Design : The tank shall be constructed of ½ ” thick black PT2E textured polypropylene sheet stock with AccTuf resin , designed to have complete modular drop - in capability . All joints and seams are to be fusion welded and electronically and hydrostatically tested for maximum strength . The tank shall incorporate transverse and longitudinal partitions manufactured of 3 / 8 ” PT2E polypropylene which shall interlock . All swash partitions shall be so designed to allow for maximum water and air flow between compartments . All partitions are to be completely welded to each other as well as to the inside of the tank . The tank shall be equipped with a combination manual fill tower and vent / overflow . The fill tower shall be 8 ” round & 8 ” tall with a round molded cover . The cover shall be fastened to the tower with a tether to prevent loss . The tower shall be located in the rear passenger side corner . A vent / overflow shall be installed inside the fill tower approximately 2 ” down from the top . The vent / overflow shall be schedule 40 polypropylene pipe and have an ID of 3 ”. The overflow shall be piped internally toward the passenger side and exit the tank through the sidewall . The overflow pipe shall be flush with the side wall . Outlets : There shall be three ( 2 ) standard outlets located on the rear tank wall : One ( 1 ) 3 ” female NPT suction fitting located on the left side . The suction port shall have one ( 1 ) sump as standard , and the sump shall be recessed into the tank floor and be a minimum of ¼ ” deep . One ( 1 ) 3 / 4 ” female NPT tank drain located in the rear tank wall on the passenger side and as low as possible .

Location

Country

United States of America (USA)

State

Nebraska

Source

Source

Nebraska Purchasing Group

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Oil and Gas, Metal, Steel, Residential

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender