Sludge Hauling for New Design Water Treatment Plant
Sector: Water Supply and Storage • Location: Maryland, United States of America
Source: Maryland Purchasing Group
1 . Currently the New Design Water Treatment Plant ( NDWTP ) dewaters residuals from its treatment process of Potomac River water in the form of pressed residual " cake " utilizing a belt filter press . Two primary coagulants are used at the plant . Ferric Chloride is used primarily in the summer months otherw
- Status
- Closed
- Sector
- Water Supply and Storage
- Location
- Maryland, United States of America
- Updated
- 3 Nov 2026
- Source
- Maryland Purchasing Group
ConstructChat
Ask ConstructChat about Sludge Hauling for New Design Water Treatment Plant
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | 1 . Currently the New Design Water Treatment Plant ( NDWTP ) dewaters residuals from its treatment process of Potomac River water in the form of pressed residual " cake " utilizing a belt filter press . Two primary coagulants are used at the plant . Ferric Chloride is used primarily in the summer months otherwise Polyaluminum Chloride is used . It is estimated that the Water Treatment Plant will generate approximately twenty - one hundred ( 2 , 100 ) tons of pressed sludge per year . Percent solids average 20 %. 2 . The press is operated at various times on a seven - day per week basis as needed . The County averages two trailer loads per week . Trailers are backed in under the loading chute where dewatered residuals drop from a conveyor belt . Operators move the truck as needed to even the load . 3 . There is on - site truck / trailer weighing equipment . The Contractor must utilize the scales located at the Treatment Plant to weigh trucks / trailers coming in empty and leaving full to determine the load weights for volumes hauled and for billing purposes . Pickup schedules shall be by mutual agreement ; however , trailers must be emptied within 5 business days of being notified of ready status by NDWTP Staff or additional empty trailers must be provided to ensure continued plant operations . 4 . Under this contract , the Contractor will provide at least two empty trailers to be loaded by NDWTP staff . |
Location
Country | United States of America (USA) |
State | Maryland |
Source
Source | Maryland Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage |
Article published date | 2026-05-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
