logo
TenderClosed

Sludge Hauling for New Design Water Treatment Plant

Sector: Water Supply and Storage • Location: Maryland, United States of America

Source: Maryland Purchasing Group

1 . Currently the New Design Water Treatment Plant ( NDWTP ) dewaters residuals from its treatment process of Potomac River water in the form of pressed residual " cake " utilizing a belt filter press . Two primary coagulants are used at the plant . Ferric Chloride is used primarily in the summer months otherw

Status
Closed
Sector
Water Supply and Storage
Location
Maryland, United States of America
Updated
3 Nov 2026
Source
Maryland Purchasing Group

ConstructChat

Ask ConstructChat about Sludge Hauling for New Design Water Treatment Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Sludge Hauling for New Design Water Treatment Plant” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to Maryland, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

1 . Currently the New Design Water Treatment Plant ( NDWTP ) dewaters residuals from its treatment process of Potomac River water in the form of pressed residual " cake " utilizing a belt filter press . Two primary coagulants are used at the plant . Ferric Chloride is used primarily in the summer months otherwise Polyaluminum Chloride is used . It is estimated that the Water Treatment Plant will generate approximately twenty - one hundred ( 2 , 100 ) tons of pressed sludge per year . Percent solids average 20 %. 2 . The press is operated at various times on a seven - day per week basis as needed . The County averages two trailer loads per week . Trailers are backed in under the loading chute where dewatered residuals drop from a conveyor belt . Operators move the truck as needed to even the load . 3 . There is on - site truck / trailer weighing equipment . The Contractor must utilize the scales located at the Treatment Plant to weigh trucks / trailers coming in empty and leaving full to determine the load weights for volumes hauled and for billing purposes . Pickup schedules shall be by mutual agreement ; however , trailers must be emptied within 5 business days of being notified of ready status by NDWTP Staff or additional empty trailers must be provided to ensure continued plant operations . 4 . Under this contract , the Contractor will provide at least two empty trailers to be loaded by NDWTP staff .

Location

Country

United States of America (USA)

State

Maryland

Source

Source

Maryland Purchasing Group

URL

More Details

Record type

Tender

Sector

Water Supply and Storage

Article published date

2026-05-02

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender