The Soccer Complex upgrades include boring in new HDPE pipe from the primary building ’ s entry point hand hole to the location of each camera . This will happen in four separate parking lots . Work includes providing , pulling in and splicing the fiber . The Contractor will also be required to mount NEMA

Status
Closed
Sector
Telecommunications, Government, Broadband, Power Generation (CCGT), Car parking, Commercial, Automotive
Location
Kansas, United States of America
Updated
3 Nov 2026
Source
Kansas Purchasing Group

ConstructChat

Ask ConstructChat about Soccer Complex Fiber Optic Infrastructure and CCTV Hardware Upgrades

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Soccer Complex Fiber Optic Infrastructure and CCTV Hardware Upgrades” is a tender record in Taiyo, linked to the Telecommunications sector. It is issued for works, goods, or services related to Kansas, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The Soccer Complex upgrades include boring in new HDPE pipe from the primary building ’ s entry point hand hole to the location of each camera . This will happen in four separate parking lots . Work includes providing , pulling in and splicing the fiber . The Contractor will also be required to mount NEMA boxes on the poles and install the correct power required to the boxes . The Scope of Work shall be in accordance with Exhibit G , Responsibility Matrix and includes all aspects of construction , installation , and construction administration , including but not limited to the following : A . Infrastructure Scope Description : Existing CCTV cameras , fiber optic cabling and associated underground pathways at the Soccer Complex parking lot are outdated and must be replaced . Note that these legacy fiber optic cables and pathways will need to remain in working order until project completion . B . Project Orientation & Program Development : a . Meet with City representatives to gain a detailed understanding of the project requirements and parameters under which the project will be constructed . b . Review City provided parking lot plans identifying fiber and camera locations . The City makes no representation or warranty as to completeness or accuracy of plans or documents provided . c . Evaluate site and existing infrastructure to determine existing conditions and extent of infrastructure replacement and best path for the fiber cabling . d . Coordinate any recommended changes or change requirements with the City . e . Based on the information provided , develop a schedule to complete infrastructure upgrades . C . Installation : Installation shall meet or exceed standards and guidelines identified in the most current version of the Project Materials and Installation Requirements ( Exhibit E ), BICSI TDMM manual and shall comply with any relevant codes such as NEC and NFPA . These will all be spliced using a core alignment fusion splicer . All cases , fiber and materials will be approved by the City ' s project representative . See Exhibit F for the fiber optic design . Installation completed or supervised by a Bicsi Certified Technician preferred . D . Sequence of Work : The Contractor shall coordinate work with the City ’ s Representative so that the work will not interfere with City ' s operation and use of buildings outside the designated work areas . The schedule and sequence of work shall be approved by the City ’ s Representative and shall be documented by the Vendor . Work shall not commence without City approval of the schedule and work sequence . When any work is to be performed outside normal business hours for the building , Vendor shall make prior arrangements with the City for entrance into the Building and the space where work is to be performed .

Location

Country

United States of America (USA)

State

Kansas

Source

Source

Kansas Purchasing Group

URL

More Details

Record type

Tender

Sector

Telecommunications, Government, Broadband, Power Generation (CCGT), Car parking, Commercial, Automotive

Article published date

2026-04-08

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender