Soil Excavation at MDT Swan Lake Facility

One of 3,973 tenders Taiyo tracks in Montana.

Source: Montana Purchasing Group

Tender
Closed

Preliminary Activities Submit Proposal as Work Plan for DEQ and PTRCB review . Conduct literature review . Review the June 30 , 2022 Remedial Investigation Report and the May 2023 Remedial Investigation Report . Review the Ferndale one - time landfarm application and permit . Coordination activities associated with comm

Status
Closed
Sector
Road, Water Supply and Storage, Oil and Gas, Power Transmission, Power Generation (CCGT)
Location
Montana, United States of America
Updated
3 Nov 2026
Source
Montana Purchasing Group

ConstructChat

Ask ConstructChat about Soil Excavation at MDT Swan Lake Facility

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Soil Excavation at MDT Swan Lake Facility” is a tender record in Taiyo, linked to the Road sector. It is issued for works, goods, or services related to Montana, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Preliminary Activities Submit Proposal as Work Plan for DEQ and PTRCB review . Conduct literature review . Review the June 30 , 2022 Remedial Investigation Report and the May 2023 Remedial Investigation Report . Review the Ferndale one - time landfarm application and permit . Coordination activities associated with communications with Aaron Anderson at MDT , Reed Miner at DEQ , and Steve Opp with the USFS . Excavation Activities Part of the Excavation Activities will occur on National Forest System Lands administered by the USFS . Coordinate with Steve Opp of the Forest Service when specific dates are scheduled . Excavate shallow impacted subsurface soils in the source delineated by MW8 / SB5 , SB6 and SB7 . Excavation is anticipated to extend 5 to 7 feet bgs in depth . Excavation activities should be conducted during a period of low water to minimize groundwater infiltration into the excavation pit . It is recommended to start excavation in the southwest corner and proceed to the northeast . Screen soil with Photoionization Detector utilizing a heated headspace method . There will be some clean overburden in the southwest corner . Prepare to separate as much as 250 loose cubic yards of clean overburden during the excavation process . Separate clean overburden to use as backfill . MDT will provide a Grizzly Screen to filter out larger rocks and boulders from the excavation . Excavated soil may need to be screened twice to separate larger rocks and boulders . Screened rocks and boulders may be used as backfill . Anticipate some groundwater infiltration into the excavation boundary . No dewatering activities are approved during excavation activities . Excavate in a strategic manner to minimize the disruption of groundwater on excavation activities . Transport impacted soil to a one - time landfarm facility at the MDT Ferndale facility . Contractor will present their excavation estimates based on a loose cubic yards unit cost . Please provide the costs for handling and screening material , to be divided between clean overburden to be placed back in the excavation and contaminated soil to be hauled to the one - time landfarm . Assuming a 25 % swell , base your bid on the excavation of 750 loose cubic yards of contaminated soil and 250 loose cubic yards of overburden . Actual volumes will be determined in the field . Remove the defunct septic tank if it interferes with excavation activities . The defunct septic tank appears to be assembled from treated timbers . Timbers will need to be disposed at a Class II Landfill . Contractor will inspect the defunct septic tank and have it pumped if sludge is present prior to the excavation . Itemize costs for sludge removal separately if they prove to be unnecessary . Collect confirmation soil samples . One composite sample is necessary per sidewall on every sidewall . Budget to collect a second sample per headwall on the following criteria : A discrete soil sample is determined necessary for contamination left in place . One sample as necessary to be used for direct contact criteria . One surface ( 0 - 2 ) sample . Analyze soil samples for Volatile Petroleum Hydrocarbons ( VPH ), Extractable Petroleum Hydrocarbons ( EPH ) screen . Fractionate EPH with Polycyclic Aromatic Hydrocarbons ( PAH ) if the Total Extractoble Hydrocarbon ( TEH ) value exceeds 200 ppm . Submit all soil samples to DEQ - approved laboratory for analytical services . All analytical invoices will be paid directly by MDT . Validate data , including the collection of duplicates , equipment , and trip blanks per DEQ guidance . Mix 1760 lbs of a dry powder Oxygen Releasing Compound ( ORC ) into the backfill . Utilize calcium peroxide , similar to ORC - A . Backfill the excavation in 6 - inch lifts and compact each lift to at least 95 % of the proctor . Provide compaction testing as needed . Provide construction oversight during excavation and backfilling activities . Excavation contractors and oversight personnel are required to have current 40 - HAZWOPER training with current 8 - hour refresher training . Submit a Cleanup Report to DEQ and MDT following cleanup activities and groundwater monitoring . The cleanup Report will follow the DEQ PTCS Cleanup Report Expectations guidance document . Reminder : this includes updating the RCP and completing applicable DVSFs . Landfarm Activities Review the Ferndale one - time landfarm application and permit ( attachment A ). Properly prepare the landfarm site at 13114 MT Highway 83 . Characterize soil hauled to landfarm by collecting one five - point composite sample per 200 cubic yards deposited at landfarm . Samples will be analyzed for VPH , EPH , and 8270 for SVOCs . During excavation activities , soil may be deposited on landfarm site , but deposited soil must be spread to a 6 ” lift within one week of completion of excavation activities . Place a berm along the southwest corner of the landfarm as necessary to control surface runoff . The berm may be placed following placement of soil as to facilitate the actual landfarm size . Till landfarm soil approximately 3 months after soil is spread . Till soil once prior to first snowfall in late fall and once in late spring post snowmelt . Continue with landfarm maintenance through 2026 and 2027 . Sample soil in Fall 2026 . Collect five - point composite samples per 200 cubic yards . Samples will be analyzed for VPH , EPH ( fractionate with PAH if necessary ), and 8270 for SVOCs . Annual Sampling event will native soil beneath landfarm soil to verify no leaching has occurred . Soil samples will be collected from 1 - 3 feet beneath native surface and analyzed for VPH , EPH ( fractionated with PAHs if necessary ), and 8270 for SVOCs . Validate all laboratory analytical data using DEQ ’ s Data Validation Summary Form ( DVSF ) found online under the Guidance dropdown at the Petroleum Tank Cleanup Section ( PTCS ) webpage . Contractor will obtain utility locates as necessary to complete the work . Post Excavation Groundwater Monitoring It is anticipated that MW - 8 will be destroyed by excavation . MW - 8 will need to be reinstalled . The replacement well should be 2 ” diameter with a screened interval from 4 - 14 ’ bgs . It will be completed with a flush mounted monument . Utilize a liquid tight cap and properly seal well annulus to prevent any potential corridors from surface water to groundwater . Measure static water levels , purge and sample the monitoring wells within 30 days of completion of excavation . Sampling should use a low - flow sampling methodology as outlined in DEQ guidance . Preserve samples in appropriate containers as directed by the lab .

Location

Country

United States of America (USA)

State

Montana

Source

Source

Montana Purchasing Group

URL

More Details

Record type

Tender

Sector

Road, Water Supply and Storage, Oil and Gas, Power Transmission, Power Generation (CCGT)

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender