Solar Installation at Southern Human Services
Sector: Waste Processing and Treatment • Location: North Carolina, United States of America
Source: North Carolina Purchasing Group
The project includes installing a photovoltaic system at the Southern Human Services Center ... complete design , procurement , installation , startup , and commissioning of the PV System . Scope of Work : The project includes installing a photovoltaic system at the Cedar Grove Community Center , located at Southern Human
- Status
- Closed
- Sector
- Waste Processing and Treatment, Biomass, Solar, Car parking, Commercial, Cement, Automotive, Road
- Location
- North Carolina, United States of America
- Updated
- 3 Nov 2026
- Source
- North Carolina Purchasing Group
ConstructChat
Ask ConstructChat about Solar Installation at Southern Human Services
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The project includes installing a photovoltaic system at the Southern Human Services Center ... complete design , procurement , installation , startup , and commissioning of the PV System . Scope of Work : The project includes installing a photovoltaic system at the Cedar Grove Community Center , located at Southern Human Services Center , located at 2501 Homestead Road , Chapel NC , 27516 . Contractors shall be responsible for the complete design , procurement , installation , startup , and commissioning of PV systems . Contractor to provide all supervision , labor , materials , and equipment required to permit , construct , and commission the project according to the plans , specifications , and addendum - excepting the exclusions listed below . This includes , but may not be limited to , the following scope : General Requirements 1 . Attend pre - construction meetings and construction meetings with the project team as requested . 2 . Prior to beginning work on site , Contractor to complete a detailed site walk to photograph and document the existing site conditions . A dated report must be submitted to Orange County before construction may begin . 3 . Maintain a clean jobsite at all times throughout the duration of the project . 4 . Repair any damage to Owner property caused by contractor or subcontractor activity , including but not limited to building , roadway , or concrete damage caused by subcontractor . 5 . Photos of workers taken while they are on site may be used in future marketing materials . 6 . All work is to be completed safely in an OSHA - approved manner and according to the approved site safety plan . 7 . A site utilization plan must be submitted for each site and approved by the Owner before construction may begin . Site utilization plans should include , at a minimum , Contractor parking locations , material laydown and staging areas , personnel lift locations , locations of portable toilets , and locations of waste disposal receptacles . 8 . Maintain updated as - built drawings . 9 . All waste materials eligible for recycling will be recycled by the Contractor . Contractor to comply with all Orange County Solid Waste certifying requirements . |
Location
Country | United States of America (USA) |
State | North Carolina |
Source
Source | North Carolina Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Waste Processing and Treatment, Biomass, Solar, Car parking, Commercial, Cement, Automotive, Road |
Article published date | 2026-05-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
